{"id":5096,"date":"2022-11-17T10:38:12","date_gmt":"2022-11-17T09:38:12","guid":{"rendered":"https:\/\/demo.shukalb.al\/?page_id=5096"},"modified":"2022-11-29T23:33:55","modified_gmt":"2022-11-29T22:33:55","slug":"position-paper-for-a-better-integration-of-capacity-development-into-capital-investment-plans","status":"publish","type":"page","link":"https:\/\/shukalb.al\/?page_id=5096&lang=en","title":{"rendered":"POSITION PAPER FOR A BETTER INTEGRATION OF CAPACITY DEVELOPMENT INTO CAPITAL INVESTMENT PLANS"},"content":{"rendered":"<p><section class=\"kc-elm kc-css-411992 kc_row\"><div class=\"kc-row-container  kc-container\"><div class=\"kc-wrap-columns\"><div class=\"kc-elm kc-css-654218 kc_col-sm-12 kc_column kc_col-sm-12\"><div class=\"kc-col-container\"><div class=\"kc-elm kc-css-777409 kc_text_block\"><\/p>\n<h1><strong>1. Introdution<\/strong><\/h1>\n<p>\n<\/div><div class=\"kc-elm kc-css-98133\" style=\"height: 20px; clear: both; width:100%;\"><\/div><div class=\"kc-elm kc-css-336288 kc_text_block\"><\/p>\n<p>This position paper is prepared in the frame of the Project \u201cDelivering Capacity Development Products for Water Supply and Sanitation Utilities in Albania\u201d financed by the \u201cRegional Capacity Development Network for Water and Sanitation Services\u201d (RCDN). The overall objective of this project is to improve the capacities of responsible sta\ufb00 in municipalities and water utilities in charge for provision of water supply and sanitation services to citizens, through the delivery of high-quality capacity development products and engagement of both municipal decision makers and management of water utilities.\u00a0<span style=\"font-style: inherit;\">SHUKALB\u2019s particular focus of work is to provide capacity development and performance improvement products. The organization is committed to self-development progress, in altering to a national reference for capacity development in Albania.\u00a0<\/span><span style=\"font-style: inherit;\">Among the specific results expected from the project was development of SHUKALB\u2019s Advocacy Strategy, which has already identified some priority topics to drive organization\u2019s advocacy work in capacity development of the\u00a0<\/span><span style=\"font-style: inherit;\">water sector in Albania. Advocacy Strategy is followed by development of a Position Paper for the identified topics. This Position Paper seeks to highlight usability of SHUKALB\u2019S current and future roles in Capacity Development for the Capital Investment topic. The paper tries to look into capital investment component and associated measures as part of a bigger policy and donor engagement context. It evaluates the usefulness and the constructive roles its engagement in the Government \u2013 Donor dialogue could generate for the water sector, especially with regards to capacity development measures. The paper concentrates on capacity development aspects and institutional\u2019 needs by advocating for options that seek to channel how SHUKALB delivery and o\ufb00er on capacity development for capital investment could be better explored\/utilized by donor community and municipalities.\u00a0<\/span><span style=\"font-style: inherit;\">A Joint Advocacy Strategy has also been developed in partnership with Albanian Associations of Municipalities, aimed at addressing common topics of concern for the three associations.<\/span><\/p>\n<p>\n<\/div><div class=\"kc-elm kc-css-520666\" style=\"height: 20px; clear: both; width:100%;\"><\/div><div class=\"kc-elm kc-css-935734 kc_text_block\"><\/p>\n<h1><strong>2. Problem History<\/strong><\/h1>\n<p>\n<\/div><div class=\"kc-elm kc-css-687264 kc_text_block\"><\/p>\n<p>Despite the support and interventions made through the years, the water sector\u00a0<span style=\"font-style: inherit;\">infrastructure in Albania remains largely either in a poor or unsatisfactory condition to fulfil its overall objectives for providing drinking water to the population and treatment of the wastewater afterwards. While the country is rich in water resources, it su\ufb00ers from shortages of water supply \u2013 a considerable part of water distribution network is old and severely deteriorated, and losses are high. Consequently, the water supply is unreliable and water quality rather poor. Water supply is limited to 12 hours per day on average, while almost one third of the population does not have access to safe and clean drinking water. Due to under-billing, bypassing of water meters, illegal connections, and improperly working metering devices, the share of so-called non-revenue water is high, estimated at 65 per cent of the produced drinking water in 2017. The wastewater collection and treatment services lag behind that of water supply services; only 50 per cent of the population is covered by the public sewerage system, compared to 78 per cent having access to water supply system.\u00a0<\/span><span style=\"font-style: inherit;\">Previous support in water sector included\u00a0various technical assistance, equipment and investments in order to align the country with the extensive and complex environmental and water European Union (EU) regulatory framework and improve policy development. EU assistance to the water sector over the period 2007-2013 amounted to more than 110 million EUR. Various donors provide resources to support the sector; among them International Financial Institutions (IFIs) with loans and grants from the World Bank (WB), the European Investment Bank (IEB), the European Bank for Reconstruction and Development (EBRD), and other donors. Germany is a very important contributor to the water sector through Kreditanstalt f\u00fcr Wiederaufbau (KfW), while other donors are Italy, Japan, Austria, Sweden, Switzerland and the United Nations (UN). The action in frame of EU was built on the Instrument for Pre-Accession Assistance IPA 2016 assistance to be expanded further.\u00a0<\/span><span style=\"font-style: inherit;\">Capacities enhanced under IPA 2016 support for better managing the sector and operating and maintaining infrastructure will be further reinforced, as the IPA 2018 action is spanned over a longer timeframe.<\/span><\/p>\n<p>\n<\/div><div class=\"kc-elm kc-css-670373\" style=\"height: 20px; clear: both; width:100%;\"><\/div><div class=\"kc-elm kc-css-234673 kc_text_block\"><\/p>\n<h1><strong>2.1 Background<\/strong><\/h1>\n<p>\n<\/div><div class=\"kc-elm kc-css-731318\" style=\"height: 20px; clear: both; width:100%;\"><\/div><div class=\"kc-elm kc-css-214397 kc_text_block\"><\/p>\n<p>There are various policy commitments related to the water sector in Albania that are staggered through a hierarchy of important documents. Water sector is recognized by National Strategy for Development and Integration (NSDI) 2015-2020 in the Water for\u00a0people pillar- with objectives that include:<\/p>\n<p>(i) achieving coverage of sewerage network in urban and rural areas; (ii) increasing the number of households connected to wastewater treatment; (iii) applying the principle of full cost recovery; (iv) reviewing and\u00a0adjusting water tari\ufb00 structure; and (v) construction of Waste Water Treatment Projects (WWTPs) in accordance with the National Master Plan for Water Supply and Sewerage. In 2013, Government of Albania (GoA) had already endorsed the Water Supply and Sanitation (WSS) strategy 2011-2017 with World Bank assistance. The 2011-2017 strategy updated the 2003 Sector Strategy with a vision to develop proper policies and commit sufficient resources to improve the provision of water supply and sewerage services and move toward compliance with EU standards.\u00a0Having indicated to donors that the water sector should be a major focus of infrastructure support going forward, the GoA subsequently prepared a comprehensive capital investment Master Plan for the sector with the support of KfW. However, at the national level, there is a need to upgrade\/ expand key sector strategic documents. Also, there is a need to properly implement the Integrated Water Resources Management Strategy 2018-2027 as well as to adopt and implement the overarching National Sector Programme for Water, 2018-2030.<\/p>\n<p>\n<\/div><div class=\"kc-elm kc-css-133443\" style=\"height: 20px; clear: both; width:100%;\"><\/div><div class=\"kc-elm kc-css-892779 kc_text_block\"><\/p>\n<h1><strong>2.2 Current status<\/strong><\/h1>\n<h3><strong>\u00a02.2.1 Capital investments interventions and need for financing <\/strong><\/h3>\n<p>\n<\/div><div class=\"kc-elm kc-css-532051\" style=\"height: 20px; clear: both; width:100%;\"><\/div><div class=\"kc-elm kc-css-111673 kc_text_block\"><\/p>\n<p>The WSS sector is characterized by poor planning and programming capacity resulting in an overall low level of investment in water supply and wastewater collection and treatment systems, compared to the large demand estimated in the WSS Strategy\u00a0<span style=\"font-style: inherit;\">2011-2017 (868 million EUR for capital investment plus immediate replacement of defective infrastructure).\u00a0<\/span><span style=\"font-style: inherit;\">A Medium-Term Budget Framework is in place, covering the overall sector and funds specifically allocated to the responsible line ministries. However, budgets for the water sector are either constant or decreasing, which is not aligned with the capacity needs of the sector in view of water reform, including increasing performance and implementing the legal requirements and progressive alignment with EU water directives. Also available finances are not in line with reaching the targets of national strategies. On a mid-term budget\u00a0<\/span><span style=\"font-style: inherit;\">perspective, a significant proportion is funded through foreign IFI and donor sources. The national Single Project Pipeline sets out a medium- and long-term investment needs list- (twelve WSS projects totalling 648 million EUR proposed), but the projects are not mature, time bound and lack a clear link to national targets and budgets, as well as to national absorption capacity and foreign financing availability1. Nevertheless, the national water sector policy relative to water\u00a0<\/span><span style=\"font-style: inherit;\">supply and sewerage is relevant with significant e\ufb00orts been made to address key constraints and weaknesses, particularly through sector coordination and monitoring mechanisms.\u00a0<\/span><span style=\"font-style: inherit;\">A progressive implementation of investment is envisaged in frame of IPA for Albania. In its early phase, investment planned to address\u00a0<\/span><span style=\"font-style: inherit;\">pre-selected municipalities according to set criteria, including municipalities of\u00a0<\/span><span style=\"font-style: inherit;\">Berat-Kucova, Elbasan, Fier, Gjirokastra, Lezha,\u00a0<\/span><span style=\"font-style: inherit;\">Lushnja, Saranda, Shkodra, Kamza and Vlora. Final project locations and scope will be established based on the on-going feasibility studies. The follow-up phase it will potentially be requiring additional funding, and a nationally coordinated municipality driven mechanism for municipal water sector infrastructure projects selection, development and implementation.\u00a0<\/span><span style=\"font-style: inherit;\">The aim is to develop an open and e\ufb00ective mechanism which can channel additional funding into the municipalities for sustainable investments into the sector.\u00a0<\/span><span style=\"font-style: inherit;\">Building on the Municipal Infrastructure Programmes I-IV, Phase V has been established by the GoA and the KfW, with envisaged donor contributions from the EU and Switzerland, with the objective of increasing funding in the sector to implement priority investments identified in\u00a0<\/span><span style=\"font-style: inherit;\">the National Water Supply and Sewerage Master Plan and contribute to corporate development. The Master Plan estimates the investment needs of \u20ac5 billion until 2040, equal to \u20ac160 million capital allocation per year. Phase V envisages the implementation of \u20ac130 million in water supply, sewerage, and wastewater treatment priority infrastructure in up to 10 municipalities, to which the WBIF contributes with a \u20ac1.4 million grant for the preparation of technical documentation. The investments in these municipalities are expected to ensure sustainable access to safe drinking water at socially acceptable and cost-covering tari\ufb00s, adequate sanitation, and improved performance of utilities. The construction of these infrastructures is planned to be completed by the end of 2023.<\/span><\/p>\n<p>\n<\/div><\/div><\/div><\/div><\/div><\/section><section class=\"kc-elm kc-css-8047 kc_row\"><div class=\"kc-row-container  kc-container\"><div class=\"kc-wrap-columns\"><div class=\"kc-elm kc-css-418019 kc_col-sm-6 kc_column kc_col-sm-6\"><div class=\"kc-col-container\"><div class=\"kc-elm kc-css-604412\" style=\"height: 20px; clear: both; width:100%;\"><\/div><div class=\"kc-elm kc-css-321160 kc_text_block\"><\/p>\n<h3><strong>Structure of Municipal Infrastructure Program (MIP)<\/strong><\/h3>\n<p>\n<\/div><div class=\"kc-elm kc-css-59250\" style=\"height: 20px; clear: both; width:100%;\"><\/div><div class=\"kc-elm kc-css-225550 kc_text_block\"><\/p>\n<p>The Municipal Infrastructure Programme MIP I- IV is an infrastructure development programme aiming at the improvement of water supply and wastewater services of eight municipalities: Berat and Ku\u00e7ova Librazhd and Prrenjas, Delvina, Gjirokastra, Lushnja and Kamza. The 5 water utilities (UKs) and the Water Department of these municipalities act as Project Executing Agencies (PEA). See the map picture for locations.<\/p>\n<p>The Programme consists of two components:<\/p>\n<p><!-- &#091;if !supportLists&#093;-->\u2022\u00a0 <!--&#091;endif&#093;-->Institutional development \u2013 this Institutional Training Project (ITM)- through consultancy assistance to the six utilities to improve on notably financial performance and sustainability.<\/p>\n<p><!-- &#091;if !supportLists&#093;-->\u2022\u00a0 <!--&#091;endif&#093;-->Physical investments for the six water utilities. This physical component consists of financing of the investments as well as technical assistance for feasibility studies, detailed design, tender preparation, procurement and supervision of construction in the second phase of the programme. These physical investments\u00a0<span style=\"font-style: inherit;\">are supported by so-called &#8216;Implementation Consultants&#8217; (IC).<\/span><\/p>\n<p>\n<\/div><\/div><\/div><div class=\"kc-elm kc-css-682375 kc_col-sm-6 kc_column kc_col-sm-6\"><div class=\"kc-col-container\"><div class=\"kc-elm kc-css-496224\" style=\"height: 20px; clear: both; width:100%;\"><\/div><div class=\"kc-elm kc-css-959022 kc_shortcode kc_single_image\">\n\n        <img decoding=\"async\" src=\"https:\/\/shukalb.al\/wp-content\/uploads\/2022\/11\/Screenshot-2022-11-17-111305.jpg\" class=\"\" alt=\"\" \/>    <\/div>\n<\/div><\/div><\/div><\/div><\/section><section class=\"kc-elm kc-css-749645 kc_row\"><div class=\"kc-row-container  kc-container\"><div class=\"kc-wrap-columns\"><div class=\"kc-elm kc-css-871991 kc_col-sm-5 kc_column kc_col-sm-5\"><div class=\"kc-col-container\"><div class=\"kc-elm kc-css-854589\" style=\"height: 20px; clear: both; width:100%;\"><\/div><div class=\"kc-elm kc-css-970565 kc_text_block\"><\/p>\n<p><strong>Table 1:<\/strong> Estimated investment in Master Plan, 2013 \u2013 2040 Total Investment Needs (in million EUR<\/p>\n<p>\n<\/div><div class=\"kc-elm kc-css-600322 kc_shortcode kc_single_image\">\n\n        <img decoding=\"async\" src=\"https:\/\/shukalb.al\/wp-content\/uploads\/2022\/11\/Screenshot-2022-11-17-113329.jpg\" class=\"\" alt=\"\" \/>    <\/div>\n<div class=\"kc-elm kc-css-848843\" style=\"height: 20px; clear: both; width:100%;\"><\/div><div class=\"kc-elm kc-css-431603 kc_text_block\"><\/p>\n<p>Including an additional 10% contingencies (508.1 million EUR) and an additional 15% in consultant fees (762.1 million EUR) the overall cost reaches <strong>6.4 billion EUR<\/strong><\/p>\n<p>\n<\/div><\/div><\/div><div class=\"kc-elm kc-css-661537 kc_col-sm-7 kc_column kc_col-sm-7\"><div class=\"kc-col-container\"><div class=\"kc-elm kc-css-723331\" style=\"height: 20px; clear: both; width:100%;\"><\/div><div class=\"kc-elm kc-css-884577 kc_text_block\"><\/p>\n<p>Based on 10 priority water sector investments and 14 priority wastewater sector investments of the Master Plan and complementary measures to improve the functionality of past investments, AKUK has prioritized 9 water\u00a0<span style=\"font-style: inherit;\">utilities (PUC\/UK acronym in Alb) based on their performance. Projects covered by other financing partners (JICA, Italy, World Bank, etc.) and very small projects have been excluded.<\/span><\/p>\n<p>\n<\/div><div class=\"kc-elm kc-css-355674 kc_text_block\"><\/p>\n<p><strong>Table 2:<\/strong> Selected indicators of preselected utilities (data 2015)<\/p>\n<p>\n<\/div><div class=\"kc-elm kc-css-739255 kc_shortcode kc_single_image\">\n\n        <img decoding=\"async\" src=\"https:\/\/shukalb.al\/wp-content\/uploads\/2022\/11\/Screenshot-2022-11-17-113620.jpg\" class=\"\" alt=\"\" \/>    <\/div>\n<\/div><\/div><\/div><\/div><\/section><section class=\"kc-elm kc-css-447056 kc_row\"><div class=\"kc-row-container  kc-container\"><div class=\"kc-wrap-columns\"><div class=\"kc-elm kc-css-432158 kc_col-sm-12 kc_column kc_col-sm-12\"><div class=\"kc-col-container\"><div class=\"kc-elm kc-css-608300\" style=\"height: 20px; clear: both; width:100%;\"><\/div><div class=\"kc-elm kc-css-576166 kc_text_block\"><\/p>\n<h1><strong>2.3 Technical capacities a joint principle<\/strong><\/h1>\n<p>\n<\/div><div class=\"kc-elm kc-css-707245\" style=\"height: 20px; clear: both; width:100%;\"><\/div><div class=\"kc-elm kc-css-336215 kc_text_block\"><\/p>\n<p>In 2016 there was a guideline developed to assist the water sector with a transition plan in the framework of the reform, with focus on the organization and management of the Water and Sewage Utilities. The Transition Plan was meant to address the following functional areas\/issues related to the organization of the water supply and sewerage service as a result of the administrative territorial reform and the water sector reform.\u00a0<span style=\"font-style: inherit;\">Lack of technical capacities at the level of water utilities is well recognised by donors. There are insufficient trainings of employees in the PUCs, especially technical sta\ufb00. Human resources are a vulnerable aspect of PUCs sector, as the profes- sionals are either difficult to find, or in many other cases subject of frequent \u2018hiring and retiring\u2019. Infrastructure investment supported by donors is usually combined with accompanying technical assistance measures, however capacity building of PUC sta\ufb00 is usually o\ufb00ered upon hand over of investment to end beneficiary by donor. Delivered assistance from donors is rather fragmented or disunited in terms of capacity and institutional development.\u00a0<\/span><span style=\"font-style: inherit;\">Despite delivered funding, technical assistance needs are huge. Estimations made for Albania in the Master Plan for a projected timeline of 28 years (2013-2040) reach up to 762 million EURs (Table 1).<\/span><\/p>\n<p>According to EU sector approach assessment 2020, the sector reform process in terms of institutional arrangements, track record and political commitment is credible. However, further e\ufb00orts are required with regards to investment planning and coordination, building up capacities of the main actors at both national and local levels, improving governance at all levels, improving water utilities to control costs and achieve full cost recovery of operations, and improving sector performance monitoring.\u00a0<span style=\"font-style: inherit;\">Local Authorities at the Municipal level are having direct responsibility as the water and sanitation utilities are no longer centrally managed. Instead, their ownership is being transferred to the cities and municipalities, and they have e\ufb00ectively become independent companies overnight. Many of these service providers, especially the smaller ones, are finding it difficult to cope with this transition.\u00a0<\/span><span style=\"font-style: inherit;\">The new water infrastructure built by the capital investments requires new skills and capacities to be managed and operated efficiently. To date, the Measures component in the Capital Investment projects, seems to be tackling only the targeted intervention area, with limited outreach to build long term management capacities neither at Water Utilities, nor within the responsible units at Municipalities.<\/span><\/p>\n<p>\n<\/div><div class=\"kc-elm kc-css-113684\" style=\"height: 20px; clear: both; width:100%;\"><\/div><div class=\"kc-elm kc-css-158520 kc_text_block\"><\/p>\n<h1><strong>2.4 SHUKALB, a resource of established expertise and know-how<\/strong><\/h1>\n<p>\n<\/div><div class=\"kc-elm kc-css-185690\" style=\"height: 20px; clear: both; width:100%;\"><\/div><div class=\"kc-elm kc-css-119697 kc_text_block\"><\/p>\n<p>SHUKALB ongoing assessment and experience in Albania shows that institutional weakness and malfunctions are a major cause of ine\ufb00ective and unsustainable water services. Urgent attention needs to be given to build institutional capacity at all levels. Pressure for\u00a0<span style=\"font-style: inherit;\">improved local delivery of water services and responsibilities related to operation and maintenance of new investments suggest that development of institutional capacity should be more demand responsive. Capacity building is foremost a strategic element in the sustainable\u00a0development of the water sector, which is a long-term continuing process that needs to be spread throughout all activities in the sector.\u00a0<\/span><span style=\"font-style: inherit;\">SHUKALB has 20 years of experience connecting water utilities, professionals in the sector, toward sharing concerns and development ideas. It is a hub that draws valuable experience from domestic expertise and the best available international one from Regional, Pan-European and International Water Associations. Its capacities were honed over two decades of experience. From the time it was established SHUKALB has developed and implemented various programs and projects, a dding value to\u00a0<\/span><span style=\"font-style: inherit;\">development of the water sector, which is a long-term continuing process that needs to be spread throughout all activities in the sector.\u00a0<\/span><span style=\"font-style: inherit;\">SHUKALB has 20 years of experience connecting water utilities, professionals in the sector, toward sharing concerns and development ideas. It is a hub that draws valuable experience from domestic expertise and the best available international one from Regional, Pan-European and International Water Associations. Its capacities were honed over two decades of experience. From the time it was established SHUKALB has developed and implemented various programs and projects, a dding value to\u00a0\u00a0<\/span><span style=\"font-style: inherit;\">information and knowledge exchange in water sector. It has provided opportunities for young professionals to gain more experience in profession advancement and is continuously doing so.\u00a0<\/span><span style=\"font-style: inherit;\">One of SHUKALB\u2019s most important achievements in the field of capacity building is the Test-Based Certification Program, which was initiated in partnership with and under the guidance of Ministry of Infrastructure and Energy (MIE) with USAID support. In 2018, Albania\u2019s Minister of Infrastructure and Energy extended formal endorsement3 of the Program to all water and sewage utilities.<\/span><\/p>\n<p>\n<\/div><div class=\"kc-elm kc-css-552255\" style=\"height: 20px; clear: both; width:100%;\"><\/div><div class=\"kc-elm kc-css-559808 kc_text_block\"><\/p>\n<h3 style=\"margin-top: 2.6pt;\"><strong>About SHUKALB Networking<\/strong><\/h3>\n<p>SHUKALB considers networking and partnerships key in leveraging knowledge and know how. The membership at national and international professional partnerships is considered as contributing factor to increased professional development and understanding across borders. SHUKALB is already member of:<\/p>\n<p><!-- &#091;if !supportLists&#093;--><strong>\u2022\u00a0\u00a0\u00a0 <!--&#091;endif&#093;-->International Water Association (IWA)<\/strong> is a global reference point for water professionals, spanning the continuum between research and practice, and covering all facets of the water cycle. Through its network of members and experts in research, practice, regulation, industry, consulting and manufacturing. SHUKALB is a member of IWA since 2010, and since 2015 is a member of the Governing Board of IWA.<\/p>\n<p><!-- &#091;if !supportLists&#093;--><strong>\u2022\u00a0\u00a0\u00a0 <!--&#091;endif&#093;-->European Water Association (EWA),<\/strong> is an independent, non-governmental organization dealing with the management and improvement of water environment. It is one of the major professional associations in Europe. SHUKALB is a member with full voting rights in EWA since 2006, and has been represented in the Management Council since 2009.<\/p>\n<p><!-- &#091;if !supportLists&#093;--><strong>\u2022\u00a0\u00a0\u00a0 <!--&#091;endif&#093;-->Association of Boards of Certi\ufb01cation (ABC),<\/strong> is the association of certifying authorities for water and wastewater operators in the USA. SHUKALB is a member of ABC since 2015.<\/p>\n<p><strong><span style=\"text-indent: 2.7pt; font-style: inherit;\">\u2022\u00a0\u00a0\u00a0 <\/span><\/strong><span style=\"text-indent: 2.7pt; font-style: inherit;\"><strong>International Association of Water Service Companies in the Danube River Catchment Area (IAWD),<\/strong> is a regional platform that facilitates the voice of water utilities in the Danube region o\ufb00ering information exchange, peer to peer networking and knowledge sharing. SHUKALB is an extraordinary member of IAWD since 2017.<\/span><\/p>\n<p>\n<\/div><div class=\"kc-elm kc-css-118750\" style=\"height: 20px; clear: both; width:100%;\"><\/div><div class=\"kc-elm kc-css-662212 kc_text_block\"><\/p>\n<p>Program objective was to help ensure that Albania\u2019s water and sewage sector workforce has the knowledge and skills to meet the country\u2019s water supply and sewerage services needs and bring them into compliance with\u00a0<span style=\"font-style: inherit;\">European Union directives.\u00a0<\/span><span style=\"font-style: inherit;\">A subsequent achievement of institutionalization of the Program was the signing of a cooperation agreement between MIE Albania and Ministry of Economic\u00a0\u00a0<\/span><span style=\"font-style: inherit;\">Development Kosovo (MED) for a joint certification program, based on testing for Water and Sanitation Operators in both countries. Albania is a pioneering country in the region to have formalised a National Training and Certification Program for operational managers of Water and Sanitation Utilities.\u00a0<\/span><span style=\"font-style: inherit;\">Governing body of the program is the Certification Board, constituted by key stakeholders which have allowed Albanian Institutions to have started the implementation of the Certification Program4 in the short term. As a result of SHUKALB\u2019s work over the 20 years with developing and delivering training and\u00a0<\/span><span style=\"font-style: inherit;\">capacity building programs, as part of partnerships and support from donors such as USAID and GIZ, SHUKALB has today a wide and rich o\ufb00er that responds to the needs of water utilities in improving their managerial as well as technical skills, at di\ufb00erent levels of the utility. SHUKALB\u2019s o\ufb00er for capacity development consists in:<\/span><\/p>\n<p><!-- &#091;if !supportLists&#093;-->\u2022\u00a0 <!--&#091;endif&#093;-->46 training courses that cover water supply and treatment, sewerage and wastewater treatment, management, and cross cutting areas.<\/p>\n<p><span style=\"text-indent: -8.75pt; font-style: inherit;\">\u2022\u00a0 <\/span><span style=\"text-indent: -8.75pt; font-style: inherit;\">A pool of more than 126 trained experts<\/span><\/p>\n<p>\n<\/div><div class=\"kc-elm kc-css-178344\" style=\"height: 20px; clear: both; width:100%;\"><\/div><div class=\"kc-elm kc-css-615725 kc_text_block\"><\/p>\n<h3><strong>SHUKALB\u2019s o\ufb00er for capacity development:<\/strong><\/h3>\n<p>\n<\/div><div class=\"kc-elm kc-css-293755\" style=\"height: 20px; clear: both; width:100%;\"><\/div><\/div><\/div><\/div><\/div><\/section><section class=\"kc-elm kc-css-560309 kc_row\"><div class=\"kc-row-container  kc-container\"><div class=\"kc-wrap-columns\"><div class=\"kc-elm kc-css-633592 kc_col-sm-6 kc_column kc_col-sm-6\"><div class=\"kc-col-container\"><div class=\"kc-elm kc-css-241469 kc_text_block\"><\/p>\n<h4><strong>Management Management Supervising<\/strong><\/h4>\n<p>&#8211; Personal and Professional Skills<\/p>\n<p>&#8211; Ethics for Water and Wastewater Professionals<\/p>\n<p>&#8211; Financial Management for Non-Financial Managers<\/p>\n<p>&#8211; Crisis and Emergency Management Customer Service and Public Relations<\/p>\n<p>&#8211; Financial Statements and their Role in Decision Making<\/p>\n<h4><strong>Sewerage and Wastewater Treatment<\/strong><\/h4>\n<p>&#8211; Operation and Maintenance of Wastewater Collection System I<\/p>\n<p>&#8211; Operation and Maintenance of Wastewater Collection System II<\/p>\n<p>&#8211; Repair and Rehabilitation of Wastewater Collection System<\/p>\n<p>&#8211; Overview of Wastewater Treatment Safety for Wastewater Professionals<\/p>\n<p>&#8211; Preliminary and Primary Wastewater Treatment<\/p>\n<p>&#8211; Secondary Wastewater Treatment \u2013 Ponds, Lagoons and Wetlands<\/p>\n<p>&#8211; Secondary Wastewater Treatment \u2013 Fixed Film Methods<\/p>\n<p>&#8211; Secondary Wastewater Treatment \u2013 Activated Sludge Methods<\/p>\n<p>&#8211; Sludge Treatment and Biosolids Management<\/p>\n<p>&#8211; Mathematics for Wastewater Treatment Professional<\/p>\n<p>&#8211; Nutrient Removal \u2013 Biological and Chemical<\/p>\n<p>&#8211; Sampling and Laboratory Procedures for Wastewater<\/p>\n<h4><strong>Distance Learning (online)<\/strong><\/h4>\n<p>&#8211; Guidelines for Advisory Council Members<\/p>\n<p>\n<\/div><\/div><\/div><div class=\"kc-elm kc-css-111296 kc_col-sm-6 kc_column kc_col-sm-6\"><div class=\"kc-col-container\"><div class=\"kc-elm kc-css-281231 kc_text_block\"><\/p>\n<h4><strong>Cross Cutting<\/strong><\/h4>\n<p>&#8211; Asset Management<\/p>\n<p>&#8211; Performance Management Through Benchmarking Guidelines for Advisory Council Members Business Planning for Performance Improvement Water Loss Management I<\/p>\n<p>&#8211; Water Loss Management II Leakage Control<\/p>\n<p>&#8211; General Safety for Water and Wastewater Professionals<\/p>\n<p>&#8211; Equipment maintenance \u2013 Motors, pumps and valves for Drinking Water and Wastewater Professionals<\/p>\n<p>&#8211; General Mathematics for Water and Waste water Professionals<\/p>\n<p>&#8211; Energy Efficiency in Water and Wastewater Utilities<\/p>\n<p>&#8211; SCADA System Overview for Water and Wastewater Professionals<\/p>\n<h4><strong>Water Supply and Treatment<\/strong><\/h4>\n<p>&#8211; Water Treatment Plant Operation and Maintenance Water Sources and Intake Structure<\/p>\n<p>&#8211; Small Water Systems Introduction to Water Treatment<\/p>\n<p>&#8211; Water Quality in the Distribution System<\/p>\n<p>&#8211; Sampling and Laboratory Procedures for Water and Wastewater<\/p>\n<p>&#8211; Water Meters, Valves and Fire Hydrants Fundamentals of Water System Hydraulics Wells Operation<\/p>\n<p>&#8211; Water Mains and Storage Facilities<\/p>\n<p>&#8211; Applied Mathematic for Water Treatment Operators<\/p>\n<p>&#8211; Pretreatment, Taste and Odor<\/p>\n<p>&#8211; Metals Control<\/p>\n<p>\n<\/div><\/div><\/div><\/div><\/div><\/section><section class=\"kc-elm kc-css-385418 kc_row\"><div class=\"kc-row-container  kc-container\"><div class=\"kc-wrap-columns\"><div class=\"kc-elm kc-css-791963 kc_col-sm-12 kc_column kc_col-sm-12\"><div class=\"kc-col-container\"><div class=\"kc-elm kc-css-555256\" style=\"height: 20px; clear: both; width:100%;\"><\/div><div class=\"kc-elm kc-css-863313 kc_text_block\"><\/p>\n<p>engaged in respective water sub-areas, from water and sanitation operators, academia and private sector in both countries, Albania and Kosovo engaged in respective water sectors.<\/p>\n<p><!-- &#091;if !supportLists&#093;-->\u2022\u00a0 <!--&#091;endif&#093;--><!-- &#091;if gte vml 1&#093;><v:shape id=\"_x0000_s1026\" style=&#039;position:absolute;left:0;text-align:left; margin-left:73.7pt;margin-top:117.8pt;width:3.35pt;height:3.35pt;z-index:-16365056; mso-position-horizontal-relative:page&#039; coordorigin=\"1474,2356\" coordsize=\"67,67\" path=\"m1507,2356r-13,2l1484,2365r-8,11l1474,2389r2,13l1484,2413r10,7l1507,2422r13,-2l1531,2413r7,-11l1540,2389r-2,-13l1531,2365r-11,-7l1507,2356xe\" fillcolor=\"#026bb3\" stroked=\"f\">\n<v:path arrowok=\"t\"\/>\n<w:wrap anchorx=\"page\"\/>\n<\/v:shape><!&#091;endif&#093;--><!-- &#091;if !vml&#093;--><img loading=\"lazy\" decoding=\"async\" src=\"file:\/\/\/C:\/Users\/user\/AppData\/Local\/Temp\/msohtmlclip1\/01\/clip_image001.gif\" width=\"5\" height=\"5\" \/><!--&#091;endif&#093;--><!-- &#091;if gte vml 1&#093;><v:shape id=\"_x0000_s1027\" style=&#039;position:absolute;left:0;text-align:left;margin-left:73.7pt; margin-top:131.95pt;width:3.35pt;height:3.35pt;z-index:-16364544; mso-position-horizontal-relative:page&#039; coordorigin=\"1474,2639\" coordsize=\"67,67\" path=\"m1507,2639r-13,3l1484,2649r-8,10l1474,2672r2,13l1484,2696r10,7l1507,2706r13,-3l1531,2696r7,-11l1540,2672r-2,-13l1531,2649r-11,-7l1507,2639xe\" fillcolor=\"#026bb3\" stroked=\"f\">\n<v:path arrowok=\"t\"\/>\n<w:wrap anchorx=\"page\"\/>\n<\/v:shape><!&#091;endif&#093;--><!-- &#091;if !vml&#093;--><img loading=\"lazy\" decoding=\"async\" src=\"file:\/\/\/C:\/Users\/user\/AppData\/Local\/Temp\/msohtmlclip1\/01\/clip_image002.gif\" width=\"5\" height=\"6\" \/><!--&#091;endif&#093;--><!-- &#091;if gte vml 1&#093;><v:shape id=\"_x0000_s1028\" style=&#039;position:absolute;left:0;text-align:left;margin-left:73.7pt; margin-top:145.95pt;width:3.35pt;height:3.35pt;z-index:-16364032; mso-position-horizontal-relative:page&#039; coordorigin=\"1474,2919\" coordsize=\"67,67\" path=\"m1507,2919r-13,3l1484,2929r-8,10l1474,2952r2,13l1484,2976r10,7l1507,2986r13,-3l1531,2976r7,-11l1540,2952r-2,-13l1531,2929r-11,-7l1507,2919xe\" fillcolor=\"#026bb3\" stroked=\"f\">\n<v:path arrowok=\"t\"\/>\n<w:wrap anchorx=\"page\"\/>\n<\/v:shape><!&#091;endif&#093;--><!-- &#091;if !vml&#093;--><img loading=\"lazy\" decoding=\"async\" src=\"file:\/\/\/C:\/Users\/user\/AppData\/Local\/Temp\/msohtmlclip1\/01\/clip_image003.gif\" width=\"5\" height=\"6\" \/><!--&#091;endif&#093;-->Professional and experienced sta\ufb00 and best practices in place for supporting the development and delivery of SHUKALB\u2019s diverse<\/p>\n<p class=\"MsoBodyText\" style=\"line-height: 115%; margin: 1.25pt 61.1pt .0001pt 18.45pt;\">o\ufb00er of training and capacity development programs.In addition, SHUKALB has established partnerships with the Danube Learning Partnership (D-LeaP) under which o\ufb00ers a range of programs that are developed at the regional level. Few highlights in the table below:<\/p>\n<p>\n<\/div><div class=\"kc-elm kc-css-474643\" style=\"height: 20px; clear: both; width:100%;\"><\/div><div class=\"kc-elm kc-css-89735 kc_text_block\"><\/p>\n<table class=\"MsoNormalTable\" style=\"margin-left: 57.05pt; border-collapse: collapse; mso-table-layout-alt: fixed; mso-yfti-tbllook: 480; mso-padding-alt: 0cm 0cm 0cm 0cm;\" border=\"0\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr style=\"mso-yfti-irow: 0; mso-yfti-firstrow: yes; height: 35.7pt;\">\n<td style=\"width: 481.9pt; background: #026BB3; padding: 0cm 0cm 0cm 0cm; height: 35.7pt;\" valign=\"top\" width=\"643\">\n<p class=\"TableParagraph\" style=\"text-align: left; line-height: 13.3pt; mso-line-height-rule: exactly; margin: 2.6pt 0cm .0001pt 13.45pt;\" align=\"left\"><b style=\"mso-bidi-font-weight: normal;\"><span style=\"font-size: 12.0pt; mso-bidi-font-size: 11.0pt; color: white;\">In the framework of the Danube Learning Partnership (D-LeaP) the following programs<\/span><\/b><b style=\"mso-bidi-font-weight: normal;\"><\/b><\/p>\n<p class=\"TableParagraph\" style=\"text-align: left; line-height: 13.3pt; mso-line-height-rule: exactly; margin: 0cm 0cm .0001pt 13.45pt;\" align=\"left\"><b style=\"mso-bidi-font-weight: normal;\"><span style=\"font-size: 12.0pt; mso-bidi-font-size: 11.0pt; color: white; letter-spacing: -.05pt;\">are<\/span><\/b><b style=\"mso-bidi-font-weight: normal;\"> <\/b><b style=\"mso-bidi-font-weight: normal;\"><span style=\"font-size: 12.0pt; mso-bidi-font-size: 11.0pt; color: white; letter-spacing: -.05pt;\">o\ufb00ered:<\/span><\/b><b style=\"mso-bidi-font-weight: normal;\"><\/b><\/p>\n<\/td>\n<\/tr>\n<tr style=\"mso-yfti-irow: 1; height: 109.0pt;\">\n<td style=\"width: 481.9pt; background: #CCE1EF; padding: 0cm 0cm 0cm 0cm; height: 109.0pt;\" valign=\"top\" width=\"643\">\n<p class=\"TableParagraph\" style=\"text-align: left; line-height: 14.35pt; mso-line-height-rule: exactly; margin: 8.1pt 0cm .0001pt 27.45pt;\" align=\"left\"><span style=\"font-size: 12.0pt; mso-bidi-font-size: 11.0pt; font-family: 'Calibri Light','sans-serif'; mso-hansi-font-family: Calibri; mso-bidi-font-family: Calibri; color: #231f20;\">Energy Efficiency Program<\/span><\/p>\n<p class=\"TableParagraph\" style=\"text-align: left; line-height: 95%; margin: .15pt 264.95pt .0001pt 27.45pt;\" align=\"left\"><span style=\"font-size: 12.0pt; mso-bidi-font-size: 11.0pt; line-height: 95%; font-family: 'Calibri Light','sans-serif'; mso-hansi-font-family: Calibri; mso-bidi-font-family: Calibri; color: #231f20; letter-spacing: -.05pt;\">Integrated<\/span> <span style=\"font-size: 12.0pt; mso-bidi-font-size: 11.0pt; line-height: 95%; font-family: 'Calibri Light','sans-serif'; mso-hansi-font-family: Calibri; mso-bidi-font-family: Calibri; color: #231f20; letter-spacing: -.05pt;\">Asset<\/span> <span style=\"font-size: 12.0pt; mso-bidi-font-size: 11.0pt; line-height: 95%; font-family: 'Calibri Light','sans-serif'; mso-hansi-font-family: Calibri; mso-bidi-font-family: Calibri; color: #231f20;\">Management Program Utility Benchmarking Program Commercial Efficiency Program<\/span><\/p>\n<p class=\"TableParagraph\" style=\"text-align: left; line-height: 13.7pt; mso-line-height-rule: exactly; margin: 0cm 0cm .0001pt 27.45pt;\" align=\"left\"><span style=\"font-size: 12.0pt; mso-bidi-font-size: 11.0pt; font-family: 'Calibri Light','sans-serif'; mso-hansi-font-family: Calibri; mso-bidi-font-family: Calibri; color: #231f20; letter-spacing: -.05pt;\">Non-Revenue<\/span> <span style=\"font-size: 12.0pt; mso-bidi-font-size: 11.0pt; font-family: 'Calibri Light','sans-serif'; mso-hansi-font-family: Calibri; mso-bidi-font-family: Calibri; color: #231f20;\">Water Program<\/span><\/p>\n<p class=\"TableParagraph\" style=\"text-align: left; line-height: 14.35pt; mso-line-height-rule: exactly; margin: 0cm 0cm .0001pt 27.45pt;\" align=\"left\"><span style=\"font-size: 12.0pt; mso-bidi-font-size: 11.0pt; font-family: 'Calibri Light','sans-serif'; mso-hansi-font-family: Calibri; mso-bidi-font-family: Calibri; color: #231f20;\">Water Safety Planning and Crisis Management Program<\/span><\/p>\n<\/td>\n<\/tr>\n<tr style=\"mso-yfti-irow: 2; height: 35.7pt;\">\n<td style=\"width: 481.9pt; background: #026BB3; padding: 0cm 0cm 0cm 0cm; height: 35.7pt;\" valign=\"top\" width=\"643\">\n<p class=\"TableParagraph\" style=\"text-align: left; line-height: 81%; margin: 4.65pt 0cm .0001pt 13.45pt;\" align=\"left\"><b style=\"mso-bidi-font-weight: normal;\"><span style=\"font-size: 12.0pt; mso-bidi-font-size: 11.0pt; line-height: 81%; color: white;\">In the framework of the Project \u201cRegional Capacity Development Network (RCDN) the following products are o\ufb00ered:<\/span><\/b><b style=\"mso-bidi-font-weight: normal;\"><\/b><\/p>\n<\/td>\n<\/tr>\n<tr style=\"mso-yfti-irow: 3; mso-yfti-lastrow: yes; height: 77.8pt;\">\n<td style=\"width: 481.9pt; background: #CCE1EF; padding: 0cm 0cm 0cm 0cm; height: 77.8pt;\" valign=\"top\" width=\"643\">\n<p class=\"TableParagraph\" style=\"text-align: left; line-height: 14.35pt; mso-line-height-rule: exactly; margin: 6.1pt 0cm .0001pt 27.45pt;\" align=\"left\"><span style=\"font-size: 12.0pt; mso-bidi-font-size: 11.0pt; font-family: 'Calibri Light','sans-serif'; mso-hansi-font-family: Calibri; mso-bidi-font-family: Calibri; color: #231f20;\">Training on Capital Infrastructure Investment Projects in the Water Sector<\/span><\/p>\n<p class=\"TableParagraph\" style=\"text-align: left; line-height: 95%; margin: .15pt 17.75pt .0001pt 27.45pt;\" align=\"left\"><span style=\"font-size: 12.0pt; mso-bidi-font-size: 11.0pt; line-height: 95%; font-family: 'Calibri Light','sans-serif'; mso-hansi-font-family: Calibri; mso-bidi-font-family: Calibri; color: #231f20;\">Peer Exchanges for successful Infrastructure Waste Water Collection and Treatment Projects<\/span><\/p>\n<p class=\"TableParagraph\" style=\"text-align: left; line-height: 14.05pt; mso-line-height-rule: exactly; margin: 0cm 0cm .0001pt 27.45pt;\" align=\"left\"><span style=\"font-size: 12.0pt; mso-bidi-font-size: 11.0pt; font-family: 'Calibri Light','sans-serif'; mso-hansi-font-family: Calibri; mso-bidi-font-family: Calibri; color: #231f20; letter-spacing: -.05pt;\">Capacity<\/span> <span style=\"font-size: 12.0pt; mso-bidi-font-size: 11.0pt; font-family: 'Calibri Light','sans-serif'; mso-hansi-font-family: Calibri; mso-bidi-font-family: Calibri; color: #231f20; letter-spacing: -.05pt;\">Development<\/span> <span style=\"font-size: 12.0pt; mso-bidi-font-size: 11.0pt; font-family: 'Calibri Light','sans-serif'; mso-hansi-font-family: Calibri; mso-bidi-font-family: Calibri; color: #231f20;\">Program for Wastewater Collection and Treatment<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\n<\/div><div class=\"kc-elm kc-css-900302\" style=\"height: 20px; clear: both; width:100%;\"><\/div><div class=\"kc-elm kc-css-630868 kc_text_block\"><\/p>\n<h1><strong>3. Policy Options<\/strong><\/h1>\n<p>\n<\/div><div class=\"kc-elm kc-css-500110\" style=\"height: 20px; clear: both; width:100%;\"><\/div><div class=\"kc-elm kc-css-447043 kc_text_block\"><\/p>\n<p>Based on the Water Supply and Sewage Master Plan, donor organizations and decision-makers should delineate (i) the sector related investment measures to be undertaken by the Government; (ii) the financing requirements to be covered by the Government, the municipalities, the banks and\/or external donors. The specific objectives of the Master Plan are the development of a prioritization system for water infrastructure investments, and the creation of a phased short,\u00a0<span style=\"font-style: inherit;\">medium- and long-term investment plan 2018\/2019. The existing master plan was updated in terms of contents and technology5.\u00a0<\/span><span style=\"font-style: inherit;\">At the same time, decentralisation process demands a process of <\/span><strong style=\"font-style: inherit;\">building \ufb01nancial, managerial and institutional capacities of local institutions.<\/strong><span style=\"font-style: inherit;\"> Experience in many countries has shown that local capacities have to be developed considerably and with sustained e\ufb00ort in order to deal with decentralised responsibilities. Such need of Water Utilities and Local Authorities should be addressed by an open approach of integrating in the whole process of planning, design and implementation of each Capital Investments the national institutions, such as SHUKALB, which can support and assist the water actors in a long run.\u00a0<\/span><span style=\"font-style: inherit;\">Although, significant e\ufb00orts are made from various actors in assisting GoA with Policy design and drafting of a new law, as well as with the development and update of the master plan, as yet no endorsement of the new draft\u00a0<\/span><span style=\"font-style: inherit;\">Strategy for Water Sector, 2018-2030 and of the new draft Law have been made. It is of imperative importance<\/span><strong style=\"font-style: inherit;\"> adoption and implementation of an overarching National Sector Programme for Water 2018-2030 and a Capital Investment Plan 2020 \u2013 2030<\/strong><span style=\"font-style: inherit;\"> which would scale down the priorities of the Master Plan in neither broad nor limited termly bases. Such an instrument would further help to improve the inadequate distribution system (Rehabilitation &amp; Improvement), and assist stakeholders shared contributions to better define the technical capacity needed for the areas as to where the investment will be directed.\u00a0<\/span><span style=\"font-style: inherit;\">Albania with KfW support has already adopted a prioritized Master Plan for the years to come until 2040, and the distribution of roles regarding investment follows a semi decentralized structure with municipalities themselves handling over 80% of investment work and Albanian Development Fund ADF, handling the 20% of remained investment out of the entire funds available for Capital Investment. Whereas associating measures to capital investment are administered by respective donors through bidding procedures and the hiring of local and international expertise, or consulting companies <\/span><strong style=\"font-style: inherit;\">that deliver technical expertise.<\/strong><span style=\"font-style: inherit;\"> Such a complexity in distribution of roles could be better addressed via more cohesive capacity development interventions and utilization of in-country existing expertise. Over the last 20 years,\u00a0<\/span><span style=\"font-style: inherit;\">qualitative expertise and products are developed within Albanian institutions, such as SHUKALB, which is available, but considered as untapped resource.\u00a0<\/span><strong style=\"font-style: inherit;\">Capacity development is an important aspect of human resource development<\/strong><span style=\"font-style: inherit;\"> and is closely related to company development. Existing shortcomings of sta\ufb00 in terms of knowledge and skills are the result of educational level of individuals themselves, but also of the policies and strategies for sta\ufb00 to attract and retain more qualified personnel. Capacity development of the necessary capacities is important for filling in gaps and weaknesses in relation to existing knowledge. Sub-sectors that may require training and capacity building are many, diverse and dynamic over the time.\u00a0<\/span><span style=\"font-style: inherit;\">However, the training should not rely only on training conducted by resources of external expertise. Rather the needs and strategies should be addressed based on specific\u00a0<\/span><span style=\"font-style: inherit;\">weaknesses and in line with corporate\/sector development objectives taking advantage of domestic sources available in capacity building.\u00a0<\/span><span style=\"font-style: inherit;\">Preserving water resources, water quality and sanitation services are challenges that will continue to be addressed persistently with infrastructure investments along with capacity building programs to face the lack of expertise and lift the capacities of sanitation professionals\u2019 in-progress. <\/span><strong style=\"font-style: inherit;\">Capacity development is cross-cutting objective <\/strong><span style=\"font-style: inherit;\">which cuts across and applies to all programs, professional groups and stakeholders involved in water sector. Because commitment to sustainability underlies components of stakeholders\u2019 work in Albania there is a potential to collaborate with and support SHUKALB workability.<\/span><\/p>\n<p>\n<\/div><div class=\"kc-elm kc-css-399795\" style=\"height: 20px; clear: both; width:100%;\"><\/div><div class=\"kc-elm kc-css-641201 kc_text_block\"><\/p>\n<h1><strong>4. Policy Statements<\/strong><\/h1>\n<p>\n<\/div><div class=\"kc-elm kc-css-766270\" style=\"height: 20px; clear: both; width:100%;\"><\/div><div class=\"kc-elm kc-css-351854 kc_text_block\"><\/p>\n<p><!-- &#091;if !supportLists&#093;--><strong>\u2022\u00a0 <!--&#091;endif&#093;-->A Multi-sectoral and inclusive accommodating arrangement to institutionalise a collaborative approach<\/strong> on policy development, co-ordination, monitoring, and the overall support of municipal infrastructure delivery, will have to be established. This would create an empowering environment for SHUKALB to contribute with own knowledge and expertise to such important processes.<\/p>\n<p><!-- &#091;if !supportLists&#093;--><strong>\u2022\u00a0 <!--&#091;endif&#093;-->The same collaborative formation is encouraged to be established for development of water sector Programme Plans.<\/strong> SHUKALB is able to address to this table-set the needs of more advanced municipalities to the weakest ones. SHUKALB is a growing pool of a mobile expertise. On one hand whatever the international expertise is used to, involvement of SHUKALB will be useful for development of the interventions that are well grounded. On the other hand, international expertise will not only pass from international experts to the local ones, but relying on SHUKALB close and\u00a0<span style=\"font-style: inherit;\">well-established ties with water utilities all over Albania it will also help distribute benefits of intervention to the entire country.<\/span><\/p>\n<p><strong>\u2022\u00a0 An essential setting for downsizing the Updated Master Plan into A Capital Investment Plan to enfold a timeframe of 5-10 years<\/strong> would have to be encouraged to allow for a better linking and recognition of capacity development associating measures to capital investment ones. Developing such a setting would thereafter help to measure capacity development needs aimed at being properly matched with dedicated assistance to the local level (Municipalities &amp; Water Utilities). Adoption of a Capital Investment Plan embracing\u00a0\u00a0<span style=\"font-style: inherit;\">responsible state agencies for water sector and related institutions, donors and capacity development suppliers or organizations, such as SHUKALB, will help getting a picture of who is doing what and how could cooperation among players be complemented, as well as improved. Such a planning has a central importance, as would mean not only production of good Investment plans, but also implementation.<\/span><\/p>\n<p><!-- &#091;if !supportLists&#093;-->\u2022\u00a0 <!--&#091;endif&#093;-->Given the various performance satisfaction levels of water utilities and the various local contexts in which they operate <strong>\ufb01nding out an e\ufb00ective mechanism to reach the cascade e\ufb00ect in assisting with capacity development at the municipal level<\/strong> would be useful in addressing the danger of disparity among end beneficiaries (water utilities). Continuous development of SHUKALB as vector for sharing experience and know how between operators, municipalities and countries will maximise the use of good practice and local expertise.<\/p>\n<p><!-- &#091;if !supportLists&#093;-->\u2022\u00a0 <!--&#091;endif&#093;-->Even though SHUKALB has assessed the need of utilities in capacity development in ongoing way, <strong>a more comprehended and structured assessment can be carried through donor support<\/strong> which one will have to be entirely devoted to capital investment aspects aimed at establishing a structured and complementing demand driven capacity development process on e\ufb00orts, roles and contributions against projected capital investment plans.<\/p>\n<p><!-- &#091;if !supportLists&#093;--><strong>\u2022\u00a0 <!--&#091;endif&#093;-->Establishing an enabling environment for capacity development actors towards shared and forward-looking engagement.<\/strong> Working in complex reformation and change processes that are supported by insufficient and scarcity of\u00a0<span style=\"font-style: inherit;\">financial resources that involve two governance levels requires viable solutions to\u00a0implementation objectives of programs at the public benefit.<\/span><\/p>\n<p>\n<\/div><div class=\"kc-elm kc-css-494336\" style=\"height: 20px; clear: both; width:100%;\"><\/div><div class=\"kc-elm kc-css-870683 kc_text_block\"><\/p>\n<h3><strong>Message of Policy Paper:<\/strong><\/h3>\n<p>Donors\u2019 development assistance and other forms of aid that subsidize most capital investment for the provision and financing of water sector in Albania (as a source of finance and capacity development) should consider to better align their Strategic Financial Plans, (SFPs) with Sector Wide Approach Plans, (SWAPs); and draw on SHUKALB\u2019s domestic experience where relevant in the field of capacity development for WSS, to fill in the local capacity development gaps through peer-group assistance and bilateral twining.<b style=\"mso-bidi-font-weight: normal;\"><\/b><\/p>\n<p>\n<\/div><\/div><\/div><\/div><\/div><\/section><\/p>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-5096","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/pages\/5096","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5096"}],"version-history":[{"count":0,"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/pages\/5096\/revisions"}],"wp:attachment":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5096"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}