{"id":2274,"date":"2018-10-09T08:09:58","date_gmt":"2018-10-09T08:09:58","guid":{"rendered":"http:\/\/shukalb.al\/?p=2274"},"modified":"2018-10-09T08:09:58","modified_gmt":"2018-10-09T08:09:58","slug":"shoqeria-ujesjelles-kanalizime-durres-vazhdon-punimet-per-perfundimin-e-linjes-se-re-te-furnizimit-me-uje-dhe-pastrimit-te-rrjetit-te-kanalizimeve","status":"publish","type":"post","link":"https:\/\/shukalb.al\/?p=2274&lang=en","title":{"rendered":"Durres Water Supply and Sewerage Company Working on Finalizing the Construction of the New Water Supply Pipeline and Cleaning the Sewerage Network"},"content":{"rendered":"<p>[:sq]<figure id=\"attachment_2265\" aria-describedby=\"caption-attachment-2265\" style=\"width: 264px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/shukalb.al\/wp-content\/uploads\/2018\/10\/UK-Durres-sep-18_1.jpg\" rel=\"attachment wp-att-2265\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-2265\" src=\"http:\/\/shukalb.al\/wp-content\/uploads\/2018\/10\/UK-Durres-sep-18_1-300x225.jpg\" alt=\"Gjat\u00eb punimeve p\u00ebr nd\u00ebrtimin e linj\u00ebs s\u00eb re t\u00eb furnizimit me uj\u00eb Foto nga UK Durr\u00ebs \" width=\"264\" height=\"198\" \/><\/a><figcaption id=\"caption-attachment-2265\" class=\"wp-caption-text\"><em>Gjat\u00eb punimeve p\u00ebr nd\u00ebrtimin e linj\u00ebs s\u00eb re t\u00eb furnizimit me uj\u00eb<\/em><br \/><em>Foto nga UK Durr\u00ebs<\/em><\/figcaption><\/figure><\/p>\n<p>Shoq\u00ebria Uj\u00ebsjell\u00ebs Kanalizime Durr\u00ebs (UK Durr\u00ebs) \u00ebsht\u00eb n\u00eb fazat finale t\u00eb pun\u00ebs p\u00ebr nd\u00ebrtimin e linj\u00ebs s\u00eb re t\u00eb furnizimit me uj\u00eb.\u00a0 Projekti pritet t\u00eb sjell\u00eb, brenda pak muajve, tre her\u00eb m\u00eb shum\u00eb uj\u00eb n\u00eb qytetin e Durr\u00ebsit, duke plot\u00ebsuar k\u00ebrkesat e saj p\u00ebr furnizim me uj\u00eb.\u00a0 Nd\u00ebrtimi i linj\u00ebs s\u00eb transmetimit prej 60 km nga puset deri n\u00eb Durr\u00ebs, ka p\u00ebrfunduar n\u00eb pjes\u00ebn me t\u00eb madhe, nd\u00ebrkohe q\u00eb ka p\u00ebrfunduar nd\u00ebrtimi i puseve, stacioni i pompave, si dhe dy faza t\u00eb testimit t\u00eb linj\u00ebs. \u00a0Artan Cahani, Supervisor i kompanis\u00eb Dorsch International Consultans, e cila ndjek ecurin\u00eb e punimeve, shprehet se ka p\u00ebrfunduar s\u00eb nd\u00ebrtuari 40 km linj\u00eb me tubacion t\u00eb cil\u00ebsis\u00eb s\u00eb lart\u00eb, i cili ka jet\u00ebgjat\u00ebsi dhe garanton furnizimin me uj\u00eb t\u00eb pijsh\u00ebm sipas parametrave evropiane.<\/p>\n<p>Tenderi p\u00ebr zbatimin e k\u00ebtij projekti \u00ebsht\u00eb fituar nga firma gjermane PWT, nd\u00ebrkoh\u00eb q\u00eb firma kontraktore ka kryer edhe punime dhe vepra arti p\u00ebr kalimin e tubacionit sip\u00ebr lumenjve apo nd\u00ebrtimin e mikrotuneleve p\u00ebr kalimet e autostrad\u00ebs. \u00a0Drejtori i Deg\u00ebs Teknike pran\u00eb Uj\u00ebsjell\u00ebs Kanalizime Durr\u00ebs (UK Durr\u00ebs), Lorenc Facja, shprehet se uj\u00ebsjell\u00ebsi i ri do t\u00eb sh\u00ebrbej\u00eb vet\u00ebm p\u00ebr t\u00eb furnizuar me uj\u00eb qytetin e Durr\u00ebsit dhe prurjet e tij do t\u00eb jen\u00eb afro 630 litra uj\u00eb n\u00eb sekond\u00eb, sasi kjo tre her\u00eb m\u00eb e madhe sesa furnizimi aktual.<\/p>\n<p>M\u00ebnyra se si \u00ebsht\u00eb konceptuar mb\u00ebrritja e ujit nga puset deri n\u00eb Durr\u00ebs \u00ebsht\u00eb e till\u00eb: Nga 7 puset q\u00eb jan\u00eb hapur me prurje 105 litra n\u00eb sekond\u00eb secili, nj\u00ebri do t\u00eb jet\u00eb rezerv\u00eb. \u00a0Ata do e d\u00ebrgojn\u00eb ujin 10 km larg, pran\u00eb hidrovorit n\u00eb fshatin Adriatik t\u00eb Kurbinit, ku gjendet stacioni i pompave dhe depoja me kapacitet 1400 m3. \u00a0Nga k\u00ebtu uji pompohet me an\u00eb t\u00eb 6 pompave (nga 8 n\u00eb total) drejt depos s\u00eb Biz\u00ebs e cila ka kapcitet 700 m3 dhe gjendet n\u00eb nj\u00eb distanc\u00eb prej 14.5 km larg nga stacioni i pompave dhe lart\u00ebsi 186 m mbi nivelin e detit. \u00a0Nga kjo depo uji do t\u00eb mb\u00ebrrij\u00eb me rrjedhje t\u00eb lir\u00eb n\u00eb Durr\u00ebs n\u00eb nj\u00eb gjat\u00ebsi prej 36 km.<\/p>\n<figure id=\"attachment_2264\" aria-describedby=\"caption-attachment-2264\" style=\"width: 225px\" class=\"wp-caption alignright\"><a href=\"http:\/\/shukalb.al\/wp-content\/uploads\/2018\/10\/UK-Durres-sep-18.jpg\" rel=\"attachment wp-att-2264\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-2264\" src=\"http:\/\/shukalb.al\/wp-content\/uploads\/2018\/10\/UK-Durres-sep-18-225x300.jpg\" alt=\"Gjat\u00eb punimeve p\u00ebr pastrimin e kolektorit kryesor Foto nga UK Durr\u00ebs \" width=\"225\" height=\"300\" \/><\/a><figcaption id=\"caption-attachment-2264\" class=\"wp-caption-text\"><em>Gjat\u00eb punimeve p\u00ebr pastrimin e kolektorit kryesor<\/em><br \/><em>Foto nga UK Durr\u00ebs<\/em><\/figcaption><\/figure>\n<p>Punimet p\u00ebr nd\u00ebrtimin e uj\u00ebsjell\u00ebsit t\u00eb ri kan\u00eb nisur n\u00eb muajin shkurt t\u00eb vitit 2016, pas n\u00ebnshkrimit t\u00eb marr\u00ebveshjes p\u00ebr financimin n\u00eb shum\u00ebn 31.6 milion euro midis Bashkis\u00eb Durr\u00ebs dhe Bank\u00ebs Bot\u00ebrore<\/p>\n<p>Gjithashtu, UK Durr\u00ebs po punon p\u00ebr pastrimin e kolektorit kryesor q\u00eb mbledh uj\u00ebrat e shiut duke nisur nga hyrja e portit n\u00eb drejtim t\u00eb lagjes nr 4. \u00a0Kolektori n\u00eb fjal\u00eb \u00ebsht\u00eb nd\u00ebrtuar para afro 90 vitesh dhe pastrimi i fundit \u00ebsht\u00eb b\u00ebr\u00eb n\u00eb vitin 1982. \u00a0P\u00ebr shkak t\u00eb mbeturinave t\u00eb shumta dhe aluvioneve q\u00eb jan\u00eb grumbulluar prej vitesh, zona n\u00eb fjal\u00eb p\u00ebrmbytet shpesh n\u00eb raste reshjesh. \u00a0UK Durr\u00ebs n\u00eb bashk\u00ebpunim me bashkin\u00eb e Durr\u00ebsit ka v\u00ebn\u00eb n\u00eb dispozicion mjetet \u00a0dhe specialist\u00ebt p\u00ebr t\u00eb kryer k\u00ebt\u00eb proces. \u00a0Kryeinxhinieri i shoq\u00ebris\u00eb, Gerald Dautaj \u00ebsht\u00eb shprehur se kjo \u00ebsht\u00eb faza e par\u00eb e\u00a0 nd\u00ebrhyrjes q\u00eb nis nga hyrja para portit deri tek qendra tregtare Bluestar, me gjat\u00ebsi 650 met\u00ebr linear.<\/p>\n<p>N\u00eb p\u00ebrfundim t\u00eb k\u00ebsaj nd\u00ebrhyrje pritet q\u00eb t\u00eb eleminohen p\u00ebrmbytjet q\u00eb ndodhin n\u00eb stin\u00ebn e dimrit. \u00a0Punimet p\u00ebr pastrimin e kolektorit po kryhen gjat\u00eb or\u00ebve t\u00eb nat\u00ebs p\u00ebr t\u00eb mos krijuar probleme n\u00eb qarkullimin e automjeteve n\u00eb zon\u00ebn n\u00eb fjal\u00eb. \u00a0Paralelisht me nd\u00ebrhyrjen e uj\u00ebsjell\u00ebsit, n\u00eb zon\u00ebn q\u00eb nis nga Brryli n\u00eb drejtim t\u00eb stacionit t\u00eb trenit dhe deri n\u00eb hyrje t\u00eb ish K\u00ebnet\u00ebs, me fondet e Bank\u00ebs Bot\u00ebrore po kryhet investimi p\u00ebr rehabilitimin e rrjetit t\u00eb kanalizimeve t\u00eb uj\u00ebrave t\u00eb zeza.<\/p>\n<p>&nbsp;[:en]<figure id=\"attachment_2265\" aria-describedby=\"caption-attachment-2265\" style=\"width: 259px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/shukalb.al\/wp-content\/uploads\/2018\/10\/UK-Durres-sep-18_1.jpg\" rel=\"attachment wp-att-2265\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-2265\" src=\"http:\/\/shukalb.al\/wp-content\/uploads\/2018\/10\/UK-Durres-sep-18_1-300x225.jpg\" alt=\"During the works for the construction of the new water supply pipeline Photo Credit: Durres WSSC \" width=\"259\" height=\"194\" \/><\/a><figcaption id=\"caption-attachment-2265\" class=\"wp-caption-text\"><em>During the works for the construction of the new water supply pipeline<\/em><br \/><em>Photo Credit: Durres WSSC<\/em><\/figcaption><\/figure><\/p>\n<p>Durres Water Supply and Sewerage Company (Durres WSSC) is in the final stages of work for the construction of the new water supply pipeline, the project is expected to bring, within few months, three times more water to the city of Durres, fulfilling its demand for water supply. \u00a0The construction of the 60 km transmission line from the well field to Durres has been almost completed, while it has been finalized the construction of the wells, the pump station and two phases of pipeline testing. Artan Cahani, Supervisor at Dorsch International Consultants, who supervises the progress of the works, said that it has been completed the construction of a 40 km line of high quality pipes, which has a long lifespan and guarantees the supply of drinking water according to European standards.<\/p>\n<p>The bidding for the implementation of this project was acquired by the German company PWT, while the contractor company has carried out the works for passing the pipeline over the rivers or construction of micro tunnels for the crossings of the highway. \u00a0The Technical Director of Durres WSSC, Lorenc Facja, says that the new water pipeline will supply water only to the city of Durres and its flow capacity will be approximately 630 liters per second, three times more than the current supply.<\/p>\n<p>The way in which the water reaches Durres from the wells is designed as follows: Out of the 7 wells with flow capacity of 105 liters per second each, one well will be kept as a backup. \u00a0They will deliver water 10 km away, near the hydropower plant in the village of Adriatik, Kurbin, into a pumping station and reservoir with a capacity of 1,400 m<sup>3<\/sup>. \u00a0From this point, water is pumped through 6 pumps (out of 8 in total) to the Besa reservoir which has a capacity of 700 m<sup>3<\/sup> and is located at a distance of 14.5 km from the pumping station and 186 m above sea level. \u00a0From this reservoir the water will be delivered through gravity flow to city of Durres through a distance of 36 km.<\/p>\n<figure id=\"attachment_2264\" aria-describedby=\"caption-attachment-2264\" style=\"width: 225px\" class=\"wp-caption alignright\"><a href=\"http:\/\/shukalb.al\/wp-content\/uploads\/2018\/10\/UK-Durres-sep-18.jpg\" rel=\"attachment wp-att-2264\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-2264\" src=\"http:\/\/shukalb.al\/wp-content\/uploads\/2018\/10\/UK-Durres-sep-18-225x300.jpg\" alt=\"During works for cleaning the main collector Photo Credit: Durres WSSC \" width=\"225\" height=\"300\" \/><\/a><figcaption id=\"caption-attachment-2264\" class=\"wp-caption-text\"><em>During works for cleaning the main collector<\/em><br \/><em>Photo Credit: Durres WSSC<\/em><\/figcaption><\/figure>\n<p>Construction works for the new water supply pipeline started in February 2016, following the signing of a 31.6 million euro financing loan agreement between Durres Municipality and the World Bank.<\/p>\n<p>Besides the construction of the new water supply pipeline, Durres WSSC is working to clean the main rainwater collector, starting from the harbor entrance to neighborhood No. 4. The collector was built approximately 90 years ago and the last cleaning was done in 1982. \u00a0Due to wastes accumulated for years, this area is often flooded during rainy seasons.\u00a0 Durres WSSC in cooperation with the municipality of Durres has ensured the necessary tools and specialists to carry out this process. \u00a0The Chief engineer of the utility, Gerald Dautaj said that this is the first phase of the intervention starting from the harbor entrance to the first shopping center Bluestar, with a length of 650 linear meters. \u00a0At the end of this intervention is expected to prevent the floods that occur during the winter season. \u00a0The works for cleaning the collector are done during the night in order to avoid any problems with the traffic. \u00a0In parallel with the cleaning of the main collector, in the area starting from Brryli towards the Durres train station and to the entrance of the former Keneta zone, Durres WSSC is working also on the rehabilitation of the sewerage network, an investment which is funded also by the World Bank.[:]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[:sq] Shoq\u00ebria Uj\u00ebsjell\u00ebs Kanalizime Durr\u00ebs (UK Durr\u00ebs) \u00ebsht\u00eb n\u00eb fazat finale t\u00eb pun\u00ebs p\u00ebr nd\u00ebrtimin e linj\u00ebs s\u00eb re t\u00eb furnizimit me uj\u00eb.\u00a0 Projekti pritet t\u00eb sjell\u00eb, brenda pak muajve,<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[207,205,213],"tags":[],"class_list":["post-2274","post","type-post","status-publish","format-standard","hentry","category-national","category-news","category-newsletter"],"_links":{"self":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/posts\/2274","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2274"}],"version-history":[{"count":0,"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/posts\/2274\/revisions"}],"wp:attachment":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2274"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2274"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2274"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}