{"id":3236,"date":"2020-02-06T15:30:59","date_gmt":"2020-02-06T15:30:59","guid":{"rendered":"http:\/\/shukalb.al\/?p=3236"},"modified":"2020-02-06T15:30:59","modified_gmt":"2020-02-06T15:30:59","slug":"shoqeria-ujesjelles-gramsh-investon-ne-rindertimin-e-rrjetit-te-brendshem-te-furnizimit-me-uje","status":"publish","type":"post","link":"https:\/\/shukalb.al\/?p=3236&lang=en","title":{"rendered":"Gramsh Water Supply Company Invests in Reconstruction of the Internal Water Supply Network"},"content":{"rendered":"<p>[:sq]<figure id=\"attachment_3234\" aria-describedby=\"caption-attachment-3234\" style=\"width: 139px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/shukalb.al\/wp-content\/uploads\/2020\/02\/Gramsh-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-3234\" src=\"http:\/\/shukalb.al\/wp-content\/uploads\/2020\/02\/Gramsh-1-169x300.jpg\" alt=\"\" width=\"139\" height=\"247\" \/><\/a><figcaption id=\"caption-attachment-3234\" class=\"wp-caption-text\"><em>Foto nga punimet p\u00ebr rikonstruksionin e rrjetit t\u00eb brendsh\u00ebm t\u00eb furnizimit me uj\u00eb n\u00eb qytetin e Gramshit<\/em><br \/><em>Foto nga Uj\u00ebsjell\u00ebs Gramsh<\/em><\/figcaption><\/figure><\/p>\n<p>N\u00eb muajin tetor 2019, Shoq\u00ebria Uj\u00ebsjell\u00ebs Gramsh nisi zbatimin e investimit p\u00ebr rind\u00ebrtimin e rrjetit t\u00eb brendsh\u00ebm t\u00eb furnizimit me uj\u00eb p\u00ebr qytetin e Gramshit. Ky investim \u00ebsht\u00eb financuar nga Qeveria Shqiptare dhe implementohet nga Agjensia Agjencia Komb\u00ebtare e Uj\u00ebsjell\u00ebs-Kanalizimeve dhe Infrastruktur\u00ebs s\u00eb Mbetjeve. \u00a0Vlera totale e investimit \u00ebsht\u00eb rreth 221.2 milion Lek\u00eb dhe \u00ebsht\u00eb planifikuar t\u00eb p\u00ebrfundoj\u00eb brenda 3 viteve.<\/p>\n<p>Investimi u miratua fal\u00eb p\u00ebrpjekjeve t\u00eb vazhdueshme t\u00eb b\u00ebra nga Shoq\u00ebria Uj\u00ebsjell\u00ebs Gramsh p\u00ebr t\u00eb p\u00ebrmir\u00ebsuar cil\u00ebsin\u00eb e sh\u00ebrbimeve t\u00eb ujit p\u00ebr konsumator\u00ebt e saj, si dhe Bashkia Gramsh, e cila mund\u00ebsoi hartimin e projektit t\u00eb rind\u00ebrtimit.<\/p>\n<p>Ky investim do t\u00eb mbuloj\u00eb nj\u00eb zon\u00eb prej rreth 15,000 banor\u00eb, dhe p\u00ebr shkak t\u00eb rritjes s\u00eb presionit sh\u00ebrbimi i furnizimit me uj\u00eb do t\u00eb arrij\u00eb n\u00eb zona t\u00eb reja si\u00e7 jan\u00eb fshatrat Pishaj dhe Llapushaj.<\/p>\n<p>Investimi synon t\u00eb siguroj\u00eb furnizim me uj\u00eb 24 or\u00eb p\u00ebr konsumator\u00ebt, duke ulur ndjesh\u00ebm kostot e mir\u00ebmbajtjes dhe operimit t\u00eb rrjetit p\u00ebr shoq\u00ebrin\u00eb, dhe p\u00ebrmir\u00ebsimin e cil\u00ebsis\u00eb s\u00eb ujit t\u00eb pijsh\u00ebm, i cili \u00ebsht\u00eb thelb\u00ebsor p\u00ebr mbrojtjen e sh\u00ebndetit publik. \u00a0Rrjeti aktual i furnizimit me uj\u00eb \u00ebsht\u00eb i amortizuar shum\u00eb p\u00ebr shkak t\u00eb jet\u00ebgjat\u00ebsis\u00eb s\u00eb tij prej 50 vitesh, dhe si pasoje shkakton kosto t\u00eb larta mir\u00ebmbajtjeje dhe ndotje t\u00eb mundshme t\u00eb ujit. \u00a0Riparimi i tubacioneve t\u00eb d\u00ebmtuara shkakton edhe nd\u00ebrprerje t\u00eb sh\u00ebrbimit t\u00eb furnizimit me uj\u00eb.<\/p>\n<p><a href=\"http:\/\/shukalb.al\/wp-content\/uploads\/2020\/02\/Gramsh-2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-3227 size-medium\" src=\"http:\/\/shukalb.al\/wp-content\/uploads\/2020\/02\/Gramsh-2-169x300.jpg\" alt=\"\" width=\"169\" height=\"300\" \/><\/a><\/p>\n<p>Investimi p\u00ebrfshin instalimin e tubave plastik\u00eb HDPE, si dhe nd\u00ebrtimin e nj\u00eb rezervuari t\u00eb ri 2,000 m3 q\u00eb do t\u00eb mund\u00ebsoj\u00eb furnizimin me uj\u00eb 24\/7 dhe optimizimin e presionit t\u00eb ujit n\u00eb rrjetin e shp\u00ebrndarjes. \u00a0Investimi parashikon nd\u00ebrhyrje n\u00eb t\u00eb gjith\u00eb rrjetin shp\u00ebrndar\u00ebs t\u00eb qytetit, p\u00ebrve\u00e7 disa zonave q\u00eb tashm\u00eb kan\u00eb nj\u00eb rrjet t\u00eb ri fal\u00eb nj\u00eb investimi t\u00eb m\u00ebparsh\u00ebm gjat\u00eb viteve 2016-2017. \u00a0P\u00ebr m\u00eb tep\u00ebr, investimi p\u00ebrfshin instalimin e uj\u00ebmat\u00ebsve p\u00ebr klient\u00ebt n\u00eb mas\u00ebn 100% nga 80% q\u00eb \u00ebsht\u00eb aktualisht.[:en]<figure id=\"attachment_3234\" aria-describedby=\"caption-attachment-3234\" style=\"width: 139px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/shukalb.al\/wp-content\/uploads\/2020\/02\/Gramsh-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-3234\" src=\"http:\/\/shukalb.al\/wp-content\/uploads\/2020\/02\/Gramsh-1-169x300.jpg\" alt=\"\" width=\"139\" height=\"247\" \/><\/a><figcaption id=\"caption-attachment-3234\" class=\"wp-caption-text\"><em>Photo of the works for the reconstruction of the internal water supply network in the city of Gramsh<\/em><br \/><em>Photo Credit: Gramsh WSC<\/em><\/figcaption><\/figure><\/p>\n<p>On October 2019, Gramsh Water Supply Company started the implementation of the investment for the reconstruction of the internal water supply network for the city of Gramsh. \u00a0This investment is funded by the Albanian Government and implemented by the National Agency of Water Supply, Sewerage and Waste Infrastructure. \u00a0The total value of the investment is about 221.2 million ALL and it is planned to be completed within 3 years.<\/p>\n<p>The investment was approved thanks to the continuous efforts made by Gramsh Water Supply Company (Gramsh WSC) to improve the water services quality to its customers, as well as the Gramsh Municipality, which enabled the design of the reconstruction project.<\/p>\n<p>This investment will cover an area of about 15,000 inhabitants, and due to the increased pressure the water supply service will reach to new areas such as the villages of Pishaj and Llapushaj.<\/p>\n<p>The investment aims to provide 24 hour water supply to customers, reducing significantly the costs of network maintenance and operation for the utility, and improving the quality of drinking water, which is crucial to protection of public health. \u00a0The current water supply network is much depreciated due to its long service life of nearly 50 years, and consequently causes high maintenance costs and potential water pollution. Repairing of broken pipes causes also interruptions of the water supply service.<\/p>\n<p><a href=\"http:\/\/shukalb.al\/wp-content\/uploads\/2020\/02\/Gramsh-2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-medium wp-image-3227\" src=\"http:\/\/shukalb.al\/wp-content\/uploads\/2020\/02\/Gramsh-2-169x300.jpg\" alt=\"\" width=\"169\" height=\"300\" \/><\/a>The investment includes the installation of HDPE plastic pipes, as well as the construction of a new 2,000 m3 reservoir that will enable a 24\/7 water supply and optimize the water pressure in the distribution network. \u00a0The investment foresees interventions throughout the city&#8217;s distribution network, except of few areas that already have a new network thanks to a previous investment during 2016-2017. \u00a0Furthermore, the investment inclueds the installation of water meters for the customers at the rate of 100% from 80% currently.[:]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[:sq] N\u00eb muajin tetor 2019, Shoq\u00ebria Uj\u00ebsjell\u00ebs Gramsh nisi zbatimin e investimit p\u00ebr rind\u00ebrtimin e rrjetit t\u00eb brendsh\u00ebm t\u00eb furnizimit me uj\u00eb p\u00ebr qytetin e Gramshit. Ky investim \u00ebsht\u00eb financuar<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[213],"tags":[],"class_list":["post-3236","post","type-post","status-publish","format-standard","hentry","category-newsletter"],"_links":{"self":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/posts\/3236","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3236"}],"version-history":[{"count":0,"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/posts\/3236\/revisions"}],"wp:attachment":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3236"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3236"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3236"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}