{"id":3808,"date":"2016-12-09T11:13:34","date_gmt":"2016-12-09T11:13:34","guid":{"rendered":"http:\/\/shukalb.al\/?p=1201"},"modified":"2016-12-09T11:13:34","modified_gmt":"2016-12-09T11:13:34","slug":"perditesim-rreth-grupit-te-punes-ministror-te-certifikimit","status":"publish","type":"post","link":"https:\/\/shukalb.al\/?p=3808&lang=en","title":{"rendered":"Update on Ministerial Certification Working Group"},"content":{"rendered":"<p>[:sq]<a href=\"http:\/\/shukalb.al\/wp-content\/uploads\/2016\/12\/Working-Group-meeting.jpg\" rel=\"attachment wp-att-1180\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-1180\" src=\"http:\/\/shukalb.al\/wp-content\/uploads\/2016\/12\/Working-Group-meeting.jpg\" alt=\"Working Group meeting\" width=\"300\" height=\"213\" \/><\/a>Grupi i Pun\u00ebs s\u00eb Ministris\u00eb s\u00eb Transportit dhe Infrastruktur\u00ebs mbi Certifikimin, s\u00ebbashku me Grupin K\u00ebshillimor Teknik, u takuan me Grupin e Projektit t\u00eb SHUKALB me 9 n\u00ebntor, me q\u00ebllim marrjen e komenteve t\u00eb institucioneve t\u00eb ndryshme, si dhe t\u00eb shoq\u00ebrive uj\u00ebsjell\u00ebs kanalizime mbi draft dokumentet q\u00eb Projekti ka p\u00ebrgatitur dhe ndar\u00eb, t\u00eb cilat p\u00ebrshkruajn\u00eb korniz\u00ebn institucionale si dhe aspektet teknike t\u00eb <em>Programit t\u00eb Certifikimit Bazuar n\u00eb Testim p\u00ebr Menaxher\u00ebt Operacional\u00eb n\u00eb Sektorin e Uj\u00ebsjell\u00ebs Kanalizimeve n\u00eb Shqip\u00ebri<\/em>.<\/p>\n<p>Diskutimi u fokusua ve\u00e7an\u00ebrisht n\u00eb propozimin mbi rrug\u00ebn e karrier\u00ebs q\u00eb duhet t\u00eb ndjekin individ\u00ebt t\u00eb cil\u00ebt punojn\u00eb apo planifikojn\u00eb t\u00eb pun\u00ebsohen n\u00eb nj\u00eb shoq\u00ebri uj\u00ebsjell\u00ebs kanalizime. Pjes\u00ebmarr\u00ebsit diskutuan edhe mbi k\u00ebrkesat e nevojshme t\u00eb arsimit dhe eksperienc\u00ebs t\u00eb rekomanduara nga Projekti, si pjes\u00eb e k\u00ebrkesave p\u00ebr certifikim n\u00eb nivele t\u00eb ndryshme. \u00a0Pjesa e fundit e takimit, p\u00ebrfshiu nj\u00eb diskutim mbi strategjin\u00eb e zbatimit dhe vler\u00ebsimin e numrit t\u00eb personave p\u00ebr t\u2019u certifikuar , si dhe kostot q\u00eb lidhen me k\u00ebt\u00eb proces.<\/p>\n<p>Pas komenteve dhe rekomandimeve t\u00eb Grupit t\u00eb Pun\u00ebs dhe Grupit K\u00ebshillimor Teknik, Projekti do t\u00eb mb\u00ebshtes\u00eb Ministrin\u00eb n\u00eb hartimin e dokumenteve t\u00eb nevojshme ligjore q\u00eb do t\u00eb duhen p\u00ebr zbatimin e Programit t\u00eb Certifikimit Bazuar n\u00eb Testim.<\/p>\n<p>&nbsp;[:en]<a href=\"http:\/\/shukalb.al\/wp-content\/uploads\/2016\/12\/Working-Group-meeting.jpg\" rel=\"attachment wp-att-1180\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-1180\" src=\"http:\/\/shukalb.al\/wp-content\/uploads\/2016\/12\/Working-Group-meeting.jpg\" alt=\"Working Group meeting\" width=\"300\" height=\"213\" \/><\/a>The Ministry of Transport and Infrastructure Certification Working Group, along with the Utility Advisory Committee, met the SHUKALB Project Group, on November 9<sup>th,<\/sup> to receive feedback from the various institutions, as well as water utility stakeholders, on the draft documents that the Project has prepared and shared regarding the institutional framework and \u00a0technical aspects of the <em>Test-Based Certification Program for Operational Managers in the Water Supply and Wastewater Sector in Albania<\/em>.<\/p>\n<p>The discussion was particularly focused on the proposed career path for the individuals who are working, or who plan to start working in a water supply and sewerage utility.\u00a0 The participants discussed the education and experience requirements recommend by the Project, as part of the requirements for certification at the different levels of certification.\u00a0 The last part of the meeting included a discussion on the implementation strategy and the estimation of the number of people to be certified, as well as the costs associated with this process.<\/p>\n<p>Following the feedback and recommendations of the Working Group and the Utility Advisory Committee, the Project Group will be supporting the Ministry in drafting the required legal documents that will be needed to support the implementation of the Test-Based Certification Program.[:]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[:sq]Grupi i Pun\u00ebs s\u00eb Ministris\u00eb s\u00eb Transportit dhe Infrastruktur\u00ebs mbi Certifikimin, s\u00ebbashku me Grupin K\u00ebshillimor Teknik, u takuan me Grupin e Projektit t\u00eb SHUKALB me 9 n\u00ebntor, me q\u00ebllim marrjen<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[207,205,213],"tags":[],"class_list":["post-3808","post","type-post","status-publish","format-standard","hentry","category-national","category-news","category-newsletter"],"_links":{"self":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/posts\/3808","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3808"}],"version-history":[{"count":0,"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/posts\/3808\/revisions"}],"wp:attachment":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3808"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3808"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3808"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}