{"id":3833,"date":"2017-04-04T17:25:01","date_gmt":"2017-04-04T17:25:01","guid":{"rendered":"http:\/\/shukalb.al\/?p=1471"},"modified":"2017-04-04T17:25:01","modified_gmt":"2017-04-04T17:25:01","slug":"projekti-i-ri-i-tunelit-ne-mailin-e-dajtit-rrit-furnizimin-me-uje-dhe-redukton-kostot","status":"publish","type":"post","link":"https:\/\/shukalb.al\/?p=3833&lang=en","title":{"rendered":"New Mount Dajti Tunnel Project to Increase Water Supply and Reduce Costs"},"content":{"rendered":"<p>[:sq]<figure id=\"attachment_1439\" aria-describedby=\"caption-attachment-1439\" style=\"width: 300px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/shukalb.al\/wp-content\/uploads\/2017\/04\/UKT-3.jpg\" rel=\"attachment wp-att-1439\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-1439\" src=\"http:\/\/shukalb.al\/wp-content\/uploads\/2017\/04\/UKT-3-300x200.jpg\" alt=\"Punimet aktuale q\u00eb tregojn\u00eb nd\u00ebrtimin e tunelit uj\u00ebsjell\u00ebs dhe hidro-elektrik p\u00ebrmes Malit t\u00eb Dajtit.\" width=\"300\" height=\"200\" \/><\/a><figcaption id=\"caption-attachment-1439\" class=\"wp-caption-text\"><em>Punimet aktuale q\u00eb tregojn\u00eb nd\u00ebrtimin e tunelit uj\u00ebsjell\u00ebs dhe hidro-elektrik p\u00ebrmes Malit t\u00eb Dajtit.<\/em><\/figcaption><\/figure><\/p>\n<p>Nj\u00eb nga projektet m\u00eb t\u00eb m\u00ebdha q\u00eb aktualisht \u00ebsht\u00eb duke u nd\u00ebrtuar nga Shoq\u00ebria Uj\u00ebsjell\u00ebs Kanalizime Tiran\u00eb \u00ebsht\u00eb fokusuar n\u00eb shfryt\u00ebzimin m\u00eb t\u00eb mir\u00eb t\u00eb burimeve t\u00eb uj\u00ebsjell\u00ebsit t\u00eb Sh\u00ebn M\u00ebris\u00eb, i cili do t\u00eb rris\u00eb n\u00eb m\u00ebnyr\u00eb t\u00eb konsiderueshme sasin\u00eb e furnizimit me uj\u00eb p\u00ebr qytetar\u00ebt e Tiran\u00ebs, kursen energji duke e transportuar k\u00ebt\u00eb burim p\u00ebrmes vet\u00ebrrjedhjes, si dhe duke ushqyer hidrocentralin e Lana Bregasit, duke rritur k\u00ebshtu sasin\u00eb e energjis\u00eb s\u00eb prodhuar.<\/p>\n<p>Ky investim \u00ebsht\u00eb nj\u00eb prej projekteve strategjike q\u00eb do t\u2019i sh\u00ebrbej\u00eb n\u00eb t\u00eb ardhmen nevojave t\u00eb zon\u00ebs s\u00eb sh\u00ebrbimit t\u00eb Tiran\u00ebs, n\u00eb m\u00ebnyr\u00eb q\u00eb t\u2019i paraprihet rritjes s\u00eb pritshme t\u00eb popullsis\u00eb dhe shtimit t\u00eb cil\u00ebsis\u00eb s\u00eb sh\u00ebrbimit t\u00eb k\u00ebrkuar nga qytetar\u00ebt.\u00a0 Projekti i ri i rikonceptimit t\u00eb burimeve t\u00eb uj\u00ebsjell\u00ebsit t\u00eb Sh\u00ebn M\u00ebris\u00eb \u00ebsht\u00eb nj\u00eb nd\u00ebrmarrje e madhe dhe ambicioze, si dhe tep\u00ebr e nevojshme, duke par\u00eb situat\u00ebn ekzistuese t\u00eb k\u00ebsaj linje furnizimi, e cila \u00ebsht\u00eb e amortizuar n\u00eb disa pjes\u00eb dhe jo eficiente nga pik\u00ebpamja ekonomike.<\/p>\n<p>Q\u00ebllimi i k\u00ebtij projekt nd\u00ebrtimi \u00ebsht\u00eb shfryt\u00ebzimi n\u00eb kapacitet t\u00eb plot\u00eb t\u00eb burimeve t\u00eb Sh\u00ebn M\u00ebris\u00eb dhe p\u00ebr t\u2019u mos u mb\u00ebshtetur vet\u00ebm n\u00eb prurjet e burimit t\u00eb Selit\u00ebs.\u00a0 Tuneli synon q\u00eb t\u00eb shfryt\u00ebzoj\u00eb burimet me an\u00eb t\u00eb rrjedhjes s\u00eb lir\u00eb duke shmangur p\u00ebrdorimin e stacionit t\u00eb pompimit t\u00eb Qaf\u00eb Moll\u00ebs, i cili k\u00ebrkon shum\u00eb kosto n\u00eb mir\u00ebmbajtje dhe n\u00eb energji.<\/p>\n<figure id=\"attachment_1440\" aria-describedby=\"caption-attachment-1440\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"http:\/\/shukalb.al\/wp-content\/uploads\/2017\/04\/UKT-5.jpg\" rel=\"attachment wp-att-1440\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-1440\" src=\"http:\/\/shukalb.al\/wp-content\/uploads\/2017\/04\/UKT-5-300x200.jpg\" alt=\"G\u00ebrmimi i tunelit p\u00ebrmes Malit t\u00eb Dajtit\" width=\"300\" height=\"200\" \/><\/a><figcaption id=\"caption-attachment-1440\" class=\"wp-caption-text\"><em>G\u00ebrmimi i tunelit p\u00ebrmes Malit t\u00eb Dajtit<\/em><\/figcaption><\/figure>\n<p>\u00cbsht\u00eb nj\u00eb projekt kompleks pasi p\u00ebrve\u00e7 linj\u00ebs s\u00eb re t\u00eb transmetimit, p\u00ebrfshin dhe g\u00ebrmimet e nj\u00eb tuneli p\u00ebr t\u00eb kaluar Malin e Dajtit, dhe nd\u00ebrtimin e nj\u00eb baseni t\u00eb ri presioni i cili do t\u00eb b\u00ebj\u00eb t\u00eb mundur transportimin e ujit n\u00eb stacionin hidro-elektrik t\u00eb Lana Bregasit p\u00ebrmes vet\u00ebrrjedhjes.<\/p>\n<p>Pes\u00eb burimet ujore karstike, q\u00eb formojn\u00eb k\u00ebt\u00eb burim t\u00eb furnizimit me uj\u00eb, ndodhen n\u00eb rr\u00ebze t\u00eb Malit me Gropa n\u00eb fshatin Sh\u00ebn M\u00ebri. \u00a0Ato merren n\u00ebp\u00ebrmjet kaptazheve tipe galeri dhe n\u00eb linja t\u00eb ve\u00e7anta futen n\u00eb Depon grumbulluese.\u00a0 Kat\u00ebr prej k\u00ebtyre burimeve mblidhen n\u00eb depo n\u00eb kuot\u00ebn 809 metra mbi nivelin e detit, nd\u00ebrsa burimi i pest\u00eb futet direkt n\u00eb tubin e trasmetimit p\u00ebr n\u00eb stacionin e pompimit t\u00eb Qaf\u00eb Moll\u00ebs.<\/p>\n<p>Linja kryesore e transmetimit t\u00eb uj\u00ebsjell\u00ebsit, duke filluar nga burimi n\u00eb kuot\u00ebn 809 metra do t\u00eb vazhdoj\u00eb rrug\u00ebn p\u00ebr n\u00eb stacionin hidro-elektrik t\u00eb Lana Bregasit duke p\u00ebrshkruar lugin\u00ebn n\u00eb af\u00ebrsi t\u00eb Domjes n\u00eb kuot\u00ebn e 420m, dhe m\u00eb n\u00eb fund zbret posht\u00eb n\u00eb kuot\u00ebn 320m.<\/p>\n<p>Uj\u00ebrat n\u00ebntok\u00ebsore t\u00eb malit t\u00eb Dajtit nuk jan\u00eb shfryt\u00ebzuar sa duhet.\u00a0 Q\u00eb nga viti 1974, vet\u00ebm burimet e Bovill\u00ebs jan\u00eb p\u00ebrdorur p\u00ebr t\u00eb furnizuar banor\u00ebt e Tiran\u00ebs, duke p\u00ebrdorur rrjedhjen p\u00ebrmes gravitetit.\u00a0 Uj\u00ebsjell\u00ebsi i Tiran\u00ebs i p\u00ebrdor burimet e Sh\u00ebn M\u00ebris\u00eb vet\u00ebm p\u00ebr prodhimin e energjis\u00eb elektrike p\u00ebrmes stacionit t\u00eb energjis\u00eb Lana Bregasit. \u00a0Linja ekzistuese e transmetimit nuk e ka kapacitetin p\u00ebr t\u00eb transmetuar t\u00eb gjith\u00eb sasin\u00eb e ujit t\u00eb prodhuar nga burimet e Sh\u00ebn M\u00ebris\u00eb. \u00a0Aktualisht, kapaciteti maksimal i linj\u00ebs ekzistuese t\u00eb transmetimit \u00ebsht\u00eb rreth 650 litra n\u00eb sekond\u00eb.<\/p>\n<p>P\u00ebrdorimi i burimeve t\u00eb Sh\u00ebn M\u00ebris\u00eb \u00ebsht\u00eb i lidhur me prurjet e ujit t\u00eb Selit\u00ebs, pasi prurjet e ujit nga burimet ndryshojn\u00eb n\u00eb var\u00ebsi t\u00eb stin\u00ebve. \u00a0N\u00eb rastet kur prurjet e ujit nga Selita jan\u00eb t\u00eb ul\u00ebta, sasia e ujit q\u00eb merret nga Sh\u00ebn M\u00ebris\u00eb p\u00ebrmes pompave rritet, me q\u00ebllim balancimin e k\u00ebrkes\u00ebs p\u00ebr uj\u00eb nga sistemi, gj\u00eb q\u00eb rrit kostot operative. \u00a0Projekti i ri \u00ebsht\u00eb dizenjuar p\u00ebr t\u00eb rritur n\u00eb m\u00ebnyr\u00eb t\u00eb konsiderueshme t\u00eb gjitha parametrat operative, duke ulur koston e prodhimit t\u00eb ujit dhe t\u00eb transmetimit.[:en]<figure id=\"attachment_1439\" aria-describedby=\"caption-attachment-1439\" style=\"width: 300px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/shukalb.al\/wp-content\/uploads\/2017\/04\/UKT-3.jpg\" rel=\"attachment wp-att-1439\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-1439\" src=\"http:\/\/shukalb.al\/wp-content\/uploads\/2017\/04\/UKT-3-300x200.jpg\" alt=\"Current works showing the construction of the water supply and hydro-electric tunnel through Mount Dajti.\" width=\"300\" height=\"200\" \/><\/a><figcaption id=\"caption-attachment-1439\" class=\"wp-caption-text\"><em>Current works showing the construction of the water supply and hydro-electric tunnel through Mount Dajti<\/em>.<\/figcaption><\/figure><\/p>\n<p>One of the major projects currently under construction by the Tirana Water Supply and Sewerage Company is focused on a better utilization of the St. Mary&#8217;s Spring water supply source, which will greatly increase the quantity of water supply to the citizens of Tirana, save energy by transporting this source by gravity, and provide flow to the hydro-electric power station of Lana Bregas, thereby increasing the amount of electric energy produced.<\/p>\n<p>This investment is one of several strategic projects that will serve for the future needs of the Tirana service area, in order to anticipate the expected continued population growth, and to meet the increase in the service quality required by the customers.\u00a0 The new project of redesigning the St. Mary&#8217;s Spring water supply source is a major and ambitious undertaking, and highly necessary, considering the condition of the current water supply line, which is damaged in some parts and not efficient from a financial point of view.<\/p>\n<figure id=\"attachment_1440\" aria-describedby=\"caption-attachment-1440\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"http:\/\/shukalb.al\/wp-content\/uploads\/2017\/04\/UKT-5.jpg\" rel=\"attachment wp-att-1440\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-1440\" src=\"http:\/\/shukalb.al\/wp-content\/uploads\/2017\/04\/UKT-5-300x200.jpg\" alt=\"Tunnel excavation through Mount Dajti\" width=\"300\" height=\"200\" \/><\/a><figcaption id=\"caption-attachment-1440\" class=\"wp-caption-text\"><em>Tunnel excavation through Mount Dajti<\/em><\/figcaption><\/figure>\n<p>The purpose of this construction project is to use the full capacity the St. Mary&#8217;s Spring and to not rely only on the water that flows from the Selita Spring.\u00a0 The tunnel aims to utilize the water resources based on gravity flow, avoiding the use of the pumping station of Qafe Molla, which has high maintenance and electrical energy costs.<\/p>\n<p>It is a complex project, because in addition to the new transmission line, it also includes excavating a tunnel through Mount Dajti, and the construction of a new pressure basin that will enable the transport of water to Lana Bregas hydro-electric power station by way of gravity flow.<\/p>\n<p>The five karst water supply springs, which make up this supply source, are located at the foot of Gropa Mountain in the village of St. Mary. \u00a0Water passes through the collection galleries, and flows to the collection reservoirs.\u00a0 Four of these water springs are collected in the reservoir at an elevation of 809 meters above sea level, and the fifth spring is channeled directly into the transmission line near the existing Qafe Molla pumping station.<\/p>\n<p>The main water transmission line, starting from the source at an elevation of 809m will continue its way to the Lana Bregas hydro-power plant by passing through the Domje Valley at an elevation of 420m, and then finally descend down to the hydro-power plant at an elevation of 320m.<\/p>\n<p>The natural spring supplies of Mount Dajti have not been sufficiently exploited. Since 1974, only the springs of Bovilla have been used to supply the inhabitants of Tirana using gravity flow. \u00a0The Tirana Water utility only used the St. Mary Spring for the production of electrical power through the Lana Bregas power station.\u00a0 The existing transmission line does not have the capacity to transmit the entire amount of water produced by the St. Mary Spring.\u00a0 Currently, the maximal capacity of the existing transmission line is about 650 liters per second.<\/p>\n<p>The use of the St. Mary Spring depends on the water flow of Selita, since the water flow from the springs varies depending on the seasons. \u00a0In cases when the water flow from Selita is low, the amount of water that is pumped from St. Mary Spring is increased, in order to balance the demand for water from the system, which increases the operating costs.\u00a0 The new project is designed to significantly increase all of the operating parameters, reducing the cost of water production and transmission.[:]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[:sq] Nj\u00eb nga projektet m\u00eb t\u00eb m\u00ebdha q\u00eb aktualisht \u00ebsht\u00eb duke u nd\u00ebrtuar nga Shoq\u00ebria Uj\u00ebsjell\u00ebs Kanalizime Tiran\u00eb \u00ebsht\u00eb fokusuar n\u00eb shfryt\u00ebzimin m\u00eb t\u00eb mir\u00eb t\u00eb burimeve t\u00eb uj\u00ebsjell\u00ebsit t\u00eb<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[207,205,213],"tags":[],"class_list":["post-3833","post","type-post","status-publish","format-standard","hentry","category-national","category-news","category-newsletter"],"_links":{"self":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/posts\/3833","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3833"}],"version-history":[{"count":0,"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/posts\/3833\/revisions"}],"wp:attachment":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3833"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3833"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3833"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}