{"id":3841,"date":"2017-05-04T16:29:53","date_gmt":"2017-05-04T16:29:53","guid":{"rendered":"http:\/\/shukalb.al\/?p=1537"},"modified":"2017-05-04T16:29:53","modified_gmt":"2017-05-04T16:29:53","slug":"uk-vlora-investime-ne-linjen-kryesore-per-te-permiresuar-furnizimin-me-uje-te-qytetareve","status":"publish","type":"post","link":"https:\/\/shukalb.al\/?p=3841&lang=en","title":{"rendered":"UK Vlora: Major Pipeline Investments to Improve Water Supply to Citizens"},"content":{"rendered":"<p>[:sq]<figure id=\"attachment_1505\" aria-describedby=\"caption-attachment-1505\" style=\"width: 238px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/shukalb.al\/wp-content\/uploads\/2017\/05\/Uk-VLore.jpg\" rel=\"attachment wp-att-1505\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-1505\" src=\"http:\/\/shukalb.al\/wp-content\/uploads\/2017\/05\/Uk-VLore-300x225.jpg\" alt=\"Punimet per rikonstruksionin e linj\u00ebs kryesore t\u00eb furnizimit me uj\u00eb\" width=\"238\" height=\"179\" \/><\/a><figcaption id=\"caption-attachment-1505\" class=\"wp-caption-text\"><em>Punimet per rikonstruksionin e linj\u00ebs kryesore t\u00eb furnizimit me uj\u00eb<\/em><\/figcaption><\/figure><\/p>\n<p>Gjat\u00eb 2017, Shoq\u00ebria Uj\u00ebsjell\u00ebs Kanalizime Vlor\u00eb (UK Vlor\u00eb) ka realizuar me sukses dy investime t\u00eb r\u00ebnd\u00ebsishme p\u00ebr rikonstruksionin e linjave kryesore t\u00eb furnizimit me uj\u00eb t\u00eb qytetit t\u00eb Vlor\u00ebs, p\u00ebrkat\u00ebsisht n\u00eb Lagjen \u201cLirim\u201d, pran\u00eb Bashkis\u00eb dhe n\u00eb Zon\u00ebn e Ujit t\u00eb Ftoht\u00eb (nga Akademia e Marin\u00ebs deri te 7 pallatet). \u00a0K\u00ebto jan\u00eb zona shum\u00eb t\u00eb vjetra t\u00eb qytetit t\u00eb Vlores t\u00eb cilat p\u00ebr nj\u00eb koh\u00eb t\u00eb gjat\u00eb kan\u00eb vuajtur nga mungesa e furnizimit me uj\u00eb n\u00eb m\u00ebnyr\u00eb t\u00eb vazhdueshme.\u00a0 Investimet konsistojn\u00eb n\u00eb z\u00ebvend\u00ebsimin e tubave t\u00eb vjetra dhe t\u00eb amortizuara t\u00eb giz\u00ebs me tuba t\u00eb reja polietileni me me densitet t\u00eb lart\u00eb (HDPE). \u00a0Z\u00ebvend\u00ebsimi i k\u00ebtyre tubacioneve lindi si domosdoshm\u00ebri si p\u00ebr shkak t\u00eb rikonstruksionit t\u00eb disa rrug\u00ebve n\u00eb qytet ashtu edhe p\u00ebr t\u00eb p\u00ebrmir\u00ebsuar situat\u00ebn e furnizimit t\u00eb abonent\u00ebve.<\/p>\n<p>Keto investime jan\u00eb pjes\u00eb e projekteve madhore t\u00eb qeveris\u00eb Shqiptare p\u00ebr rikonstruksionin e rrug\u00ebve p\u00ebrkat\u00ebse n\u00eb qytetin e Vlor\u00ebs.\u00a0 K\u00ebto investime kan\u00eb p\u00ebr q\u00ebllim p\u00ebrmir\u00ebsimin e furnizimit me uj\u00eb t\u00eb Zon\u00ebs n\u00eb t\u00eb cil\u00ebn jan\u00eb zbatuar, z\u00ebvend\u00ebsimin e tubacionit t\u00eb vjet\u00ebr dhe t\u00eb amortizuar, i nd\u00ebrtuar q\u00eb n\u00eb vitin 1940, me tubacion t\u00eb ri plastik i cili p\u00ebrmbush k\u00ebrkesat e projekteve dhe standardet, dhe vendosjen e lidhjeve t\u00eb reja n\u00eb linjen e Uj\u00ebsjell\u00ebsit.<\/p>\n<p>Gjithashtu, n\u00eb rrug\u00ebn Dhimit\u00ebr Konomi n\u00eb Vlor\u00eb, firma zbatuese e projektit t\u00eb rikonstruksionit t\u00eb k\u00ebsaj rruge ka realizuar z\u00ebvend\u00ebsimin e 2 tubave t\u00eb vjeter D700 me nj\u00eb tub t\u00eb ri D900 n\u00eb nj\u00eb gjat\u00ebsi prej 1.2 km. \u00a0Ky investim madhor ka b\u00ebr\u00eb t\u00eb mundur q\u00eb t\u00eb shtohen or\u00ebt e furnizimit me uj\u00eb p\u00ebr banor\u00ebt e zon\u00ebs, furnizimin m\u00eb t\u00eb shpejt\u00eb t\u00eb depove, eliminimin e humbjeve dhe vendosjen e lidhjeve t\u00eb reja t\u00eb abonent\u00ebve n\u00eb linj\u00ebn e re.<\/p>\n<p>Administratori i UK Vlor\u00eb, Z. Dorian Xhelili shprehet se k\u00ebto investime jan\u00eb vet\u00ebm fillimi i nj\u00eb projekti t\u00eb madh me q\u00ebllim p\u00ebrmir\u00ebsimin e cil\u00ebsis\u00eb s\u00eb jetes\u00ebs s\u00eb qytetar\u00ebve n\u00ebp\u00ebrmjet p\u00ebrmir\u00ebsimit t\u00eb cil\u00ebsis\u00eb s\u00eb ujit dhe shtimit t\u00eb or\u00ebve t\u00eb furnizimit.\u00a0 Nj\u00eb zon\u00eb shum\u00eb problematike e qytetit t\u00eb Vlor\u00ebs n\u00eb drejtim t\u00eb furnizimit me uj\u00eb ka tashm\u00eb nj\u00eb zgjidhje optimale.\u00a0 P\u00ebr t\u00eb p\u00ebrmir\u00ebsuar sh\u00ebrbimin ndaj qytetar\u00ebve UK Vlor\u00eb do t\u00eb jet\u00eb gjithmon\u00eb n\u00eb k\u00ebrkim dhe zhvillim t\u00eb investimeve dhe projekteve t\u00eb reja.[:en]<figure id=\"attachment_1505\" aria-describedby=\"caption-attachment-1505\" style=\"width: 261px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/shukalb.al\/wp-content\/uploads\/2017\/05\/Uk-VLore.jpg\" rel=\"attachment wp-att-1505\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-1505\" src=\"http:\/\/shukalb.al\/wp-content\/uploads\/2017\/05\/Uk-VLore-300x225.jpg\" alt=\"Works showing the reconstruction of the major water supply pipeline.\" width=\"261\" height=\"196\" \/><\/a><figcaption id=\"caption-attachment-1505\" class=\"wp-caption-text\"><em>Works showing the reconstruction of the major water supply pipeline.<\/em><\/figcaption><\/figure><\/p>\n<p>During 2017, the Water Supply and Sewerage Company of Vlora (UK Vlora) has successfully completed two important investments for the reconstruction of major water supply lines in the urban sections of Vlora, respectively in the &#8220;Lirim&#8221; neighbourhood, near the Municipality building, and at Uji i Ftohte area. These are some of the oldest areas in the urban part of the Municipality of Vlora, which for a long time have suffered the lack of continuous water supply. \u00a0Investments consist in replacing old and decayed cast-iron pipes with new high density, polyethylene pipe (HDPE). \u00a0The replacement of these pipelines became a necessity due to the reconstruction of several streets in the urban areas, as well as to improve the water supply service to the citizens.<\/p>\n<p>These investments are part of the major projects undertaken by the Albanian Government for the reconstruction of street infrastructure in the Municipality of Vlora. \u00a0These investments are aimed at improving water supply service in the area by replacing old and damaged pipeline, some of which were installed was early as 1940, with new plastic pipelines that meet project requirements and standards, and establishing new connections to the water pipeline.<\/p>\n<p>Also, at Dhimit\u00ebr Konomi Street in Vlora, the contractor engaged for the reconstruction of this Street has completed the replacement of 2 old pipes D700 with a new one D900 pipe at a length of 1.2 km. \u00a0This major investment has enabled to increase the timing of water supply service for the residents of the area, a faster supply of the reservoirs, elimination of losses and establishing new customer connections to the new pipeline.<\/p>\n<p>The Administrator of UK Vlora, Mr. Dorian Xhelili, said that these investments are just the beginning of a number of major projects, which aim to improve the quality of life of Vlora residents through improving water quality and increasing the hours of water supply. \u00a0A very problematic area of Vlora in terms of water supply now is now in a better situation because of these completed investments. \u00a0UK Vlora will always be looking for new investments and developing new projects, in order to improve the service to its citizen.[:]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[:sq] Gjat\u00eb 2017, Shoq\u00ebria Uj\u00ebsjell\u00ebs Kanalizime Vlor\u00eb (UK Vlor\u00eb) ka realizuar me sukses dy investime t\u00eb r\u00ebnd\u00ebsishme p\u00ebr rikonstruksionin e linjave kryesore t\u00eb furnizimit me uj\u00eb t\u00eb qytetit t\u00eb Vlor\u00ebs,<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[207,205,213],"tags":[],"class_list":["post-3841","post","type-post","status-publish","format-standard","hentry","category-national","category-news","category-newsletter"],"_links":{"self":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/posts\/3841","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3841"}],"version-history":[{"count":0,"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/posts\/3841\/revisions"}],"wp:attachment":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3841"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3841"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3841"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}