{"id":3981,"date":"2019-08-02T10:34:01","date_gmt":"2019-08-02T10:34:01","guid":{"rendered":"http:\/\/shukalb.al\/?p=2764"},"modified":"2019-08-02T10:34:01","modified_gmt":"2019-08-02T10:34:01","slug":"english-three-major-investments-of-tirana-water-supply-and-sewerage-company-to-bring-significant-impact-for-the-city-of-tirana","status":"publish","type":"post","link":"https:\/\/shukalb.al\/?p=3981&lang=en","title":{"rendered":"Three Major Investments of Tirana Water Supply and Sewerage Company to Bring Significant Impact for the City of Tirana"},"content":{"rendered":"<p>[:sq]<figure id=\"attachment_2758\" aria-describedby=\"caption-attachment-2758\" style=\"width: 300px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/shukalb.al\/wp-content\/uploads\/2019\/07\/UKT3.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-2758\" src=\"http:\/\/shukalb.al\/wp-content\/uploads\/2019\/07\/UKT3-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" \/><\/a><figcaption id=\"caption-attachment-2758\" class=\"wp-caption-text\"><em>Gjat\u00eb inaugurimit t\u00eb punimeve n\u00eb linj\u00ebn e transmetimit Liqeni i Bovill\u00ebs &#8211; Impianti i Trajtimit t\u00eb Ujit, me pjes\u00ebmarrjen e (nga e djathta n\u00eb t\u00eb majt\u00eb) z. Redi Molla, Drejtor i P\u00ebrgjjithsh\u00ebm, UKT; z. Erion Veliaj, Kryetar i Bashkis\u00eb s\u00eb Tiran\u00ebs; znj. Belinda Balluku, Ministre e Infrastruktures dhe Energjise, dhe z. Alberto Cutillo, Ambasadori Italian n\u00eb Shqip\u00ebri<\/em><br \/><em>Foto nga UK Tiran\u00eb<\/em><\/figcaption><\/figure><\/p>\n<p>Tre investimet m\u00eb t\u00eb fundit t\u00eb nisura paralelisht nga Uj\u00ebsjell\u00ebs Kanalizime Tiran\u00eb (UK Tiran\u00eb) pritet t\u00eb sjellin nj\u00eb impakt t\u00eb r\u00ebnd\u00ebsish\u00ebm n\u00eb p\u00ebrmir\u00ebsimin e furnizimit me uj\u00eb p\u00ebr Qytetin e Tiran\u00ebs deri n\u00eb fund t\u00eb k\u00ebtij viti.<\/p>\n<p>Nj\u00eb pjes\u00eb e mir\u00eb e qytetit do t\u00eb furnizohet me uj\u00eb n\u00eb m\u00ebnyr\u00eb t\u00eb pand\u00ebrprer\u00eb, fal\u00eb investimit m\u00eb t\u00eb ri q\u00eb ka nisur t\u00eb kryhet nga UKT.\u00a0 B\u00ebhet fjal\u00eb p\u00ebr zonat e banuara t\u00eb t\u00eb Yzberishtit, Kod\u00ebr Kamz\u00ebs, Bathore, Institut, Kashar Selit\u00eb, Liqeni i that\u00eb etj. \u00a0Numri aktual i banor\u00ebve q\u00eb do t\u00eb furnizohen me uj\u00eb p\u00ebrmes k\u00ebsaj linje t\u00eb re, \u00ebsht\u00eb rreth 250,000 banor\u00eb dhe n\u00eb nj\u00eb periudh\u00eb 25 vje\u00e7are p\u00ebr rreth 410,000 banor\u00eb.<\/p>\n<p>Ky \u00ebsht\u00eb vet\u00ebm nj\u00eb nga tre investimet e m\u00ebdha q\u00eb pritet t\u00eb p\u00ebrfundojn\u00eb brenda vitit 2019 nga kjo shoq\u00ebri, investim q\u00eb po n\u00eb t\u00eb nj\u00ebjt\u00ebn koh\u00eb me nd\u00ebrtimin e linj\u00ebs s\u00eb transmetimit nga liqeni i Bovill\u00ebs n\u00eb impiantin e trajtimit t\u00eb ujit Bovill\u00eb, si dhe me zgjerimin e kapacitetit trajtues t\u00eb vet\u00eb impiantit.<\/p>\n<p>Nd\u00ebr sfidat m\u00eb t\u00eb m\u00ebdha t\u00eb UK Tiran\u00eb p\u00ebr vitet e ardhshme \u00ebsht\u00eb modernizimi i rrjetit shp\u00ebrndar\u00ebs, po aq sa edhe kryerja e investimeve t\u00eb reja n\u00eb zona ku mungon t\u00ebr\u00ebsisht rrjeti p\u00ebr t\u2019i dh\u00ebn\u00eb zgjidhje furnizimit me uj\u00eb t\u00eb banor\u00ebve.\u00a0 Tirana \u00ebsht\u00eb nj\u00eb qytet i cili po zgjerohet dita-dit\u00ebs dhe kjo sjell nevoj\u00ebn p\u00ebr politika efi\u00e7ente n\u00eb menaxhimin sa m\u00eb t\u00eb mir\u00eb t\u00eb shp\u00ebrndarjes s\u00eb ujit.\u00a0 \u00cbsht\u00eb ky vizion i drejtuesve t\u00eb shoq\u00ebris\u00eb, i cili synon q\u00eb me k\u00ebto investime Tirana t\u00eb ket\u00eb nj\u00eb sh\u00ebrbim shum\u00eb her\u00eb m\u00eb cil\u00ebsor t\u00eb furnizimit me uj\u00eb duke shkuar n\u00eb t\u00eb ardhmen n\u00eb furnizmin me uj\u00eb p\u00ebrgjat\u00eb 24 or\u00ebve.<\/p>\n<figure id=\"attachment_2755\" aria-describedby=\"caption-attachment-2755\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"http:\/\/shukalb.al\/wp-content\/uploads\/2019\/07\/UKT-2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-2755\" src=\"http:\/\/shukalb.al\/wp-content\/uploads\/2019\/07\/UKT-2-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" \/><\/a><figcaption id=\"caption-attachment-2755\" class=\"wp-caption-text\"><em>Gjat\u00eb punimeve p\u00ebr zgjerimin i Impiantit t\u00eb Trajtimit t\u00eb Ujit Bovill\u00eb<\/em><br \/><em>Foto nga UK Tiran\u00eb<\/em><\/figcaption><\/figure>\n<p>Shuma totale q\u00eb do t\u00eb investohet p\u00ebr Rehabilitimin e Rrjetit Hidrik t\u00eb Tiran\u00ebs \u00ebsht\u00eb 10.5 milion\u00eb euro. \u00a0Nj\u00eb investim i nisur me t\u00eb nj\u00ebjtin standard t\u00eb vendeve t\u00eb Bashkimit Europian, i cili do t\u00eb p\u00ebrmir\u00ebsoj\u00eb kapacitetin e furnizimit me uj\u00eb p\u00ebr qytetin e Tiran\u00ebs dhe zonave p\u00ebrreth, nj\u00ebkoh\u00ebsisht do t\u00eb shmang\u00eb abuzimet nga nd\u00ebrhyrjet, si dhe do t\u00eb eliminoj\u00eb humbjet e volumit t\u00eb ujit n\u00eb linj\u00ebn e transmetimit.<\/p>\n<p>Zgjerimi i Impiantit t\u00eb Trajtimit t\u00eb Ujit Bovill\u00eb \u00ebsht\u00eb nj\u00eb nga tre pjes\u00ebt q\u00eb p\u00ebrb\u00ebjn\u00eb k\u00ebt\u00eb projekt madhor q\u00eb ka nisur Uj\u00ebsjell\u00ebs Kanalizime Tiran\u00eb. \u00a0N\u00eb t\u00ebr\u00ebsin\u00eb e tij projekti \u00ebsht\u00eb hartuar me nj\u00eb perspektiv\u00eb 25 vje\u00e7are, me aft\u00ebsi prodhimi n\u00eb perspektiv\u00eb 3600l\/sec, ai p\u00ebrfshin nd\u00ebrtimin e nj\u00eb linje transmetimi nga Liqeni i Bovill\u00ebs deri n\u00eb Impiant me gjat\u00ebsi 10 km; zgjerimin e impiantit t\u00eb Bovill\u00ebs me 30% m\u00eb shum\u00eb t\u00eb kapacitetit t\u00eb tij p\u00ebrpunues; si dhe nd\u00ebrtimin e nj\u00eb linje transmetimi furnizimi nga impianti i Bovill\u00ebs deri n\u00eb depon e Yzberishtit.<\/p>\n<figure id=\"attachment_2756\" aria-describedby=\"caption-attachment-2756\" style=\"width: 200px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/shukalb.al\/wp-content\/uploads\/2019\/07\/UKT-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-2756\" src=\"http:\/\/shukalb.al\/wp-content\/uploads\/2019\/07\/UKT-1-200x300.jpg\" alt=\"\" width=\"200\" height=\"300\" \/><\/a><figcaption id=\"caption-attachment-2756\" class=\"wp-caption-text\"><em>Gjat\u00eb punimeve p\u00ebr linj\u00ebn e transmetimit Bovill\u00eb &#8211; Yzberisht!<\/em><br \/><em>Foto nga UK Tiran\u00eb<\/em><\/figcaption><\/figure>\n<p>Ky investim do t\u00eb eliminoj\u00eb t\u00ebr\u00ebsisht furnizimin me uj\u00eb p\u00ebrmes stacioneve t\u00eb pompimit, me eficenc\u00eb t\u00eb lart\u00eb t\u00eb kursimit t\u00eb energjis\u00eb elektrike me vler\u00eb rreth 1.1 mil Euro n\u00eb vit, dhe nj\u00ebkohesisht duke shnd\u00ebrruar t\u00ebr\u00ebsisht cil\u00ebsin\u00eb e ujit t\u00eb furnizuar.<\/p>\n<p>S\u00eb fundmi, nga nd\u00ebrtimi i linj\u00ebs s\u00eb transmetimit nga impianti i Bovill\u00ebs n\u00eb Depo e Yzberishtit do t\u00eb p\u00ebrfitojn\u00eb banor\u00ebt e Yzberishtit, Kod\u00ebr Kamz\u00ebs, Bathores, Institut, Kashar Selit\u00eb dhe Liqeni i that\u00eb. Furnizimi i zonave t\u00eb m\u00ebsip\u00ebrme direkt nga Impianti i Bovill\u00ebs siguron furnizim t\u00eb q\u00ebndruesh\u00ebm dhe cil\u00ebsor p\u00ebr t\u00eb gjith\u00eb konsumator\u00ebt banues n\u00eb k\u00ebto hap\u00ebsira t\u00eb zhvilluara rishtaz.[:en]<figure id=\"attachment_2758\" aria-describedby=\"caption-attachment-2758\" style=\"width: 300px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/shukalb.al\/wp-content\/uploads\/2019\/07\/UKT3.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-2758\" src=\"http:\/\/shukalb.al\/wp-content\/uploads\/2019\/07\/UKT3-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" \/><\/a><figcaption id=\"caption-attachment-2758\" class=\"wp-caption-text\"><em>During the inauguration of the works for construction of the transmission line Bovilla Lake &#8211; Water Treatment Plant, with the participation of (from R to L) Redi Molla, General Director, Tirana WSSC; Erion Veliaj, Mayor of Tirana; Belinda Balluku, Minister of Infrastructure and Energy, and Alberto Cutillo, Italian Ambassador to Albania<\/em><br \/><em>Photo Credit: Tirana WSSC<\/em><\/figcaption><\/figure><\/p>\n<p>The three recent investments launched in parallel by Tirana Water Supply and Sewerage Company (Tirana WSSC) are expected to bring a significant impact in the improvement of water supply for the City of Tirana by the end of this year.<\/p>\n<p>A large part of the city will receive continuous supply with drinking water, thanks to the new investment started by Tirana WSSC. \u00a0The investment covers the areas of Yzberisht, Koder Kamza, Bathore, Institute, Kashar Selite, Dry Lake etc. \u00a0The current number of residents that will be supplied through the new pipeline is about 250,000 and in a 25 year period it is estimated to serve around 410,000 inhabitants.<\/p>\n<p>This is one of the three major investments expected to be finalized by 2019, being implemented in parallel with the construction of the transmission line from Bovilla Lake to Bovilla Water Treatment Plant, as well as the expansion of production capacity of the Plant itself.<\/p>\n<p>Among the biggest challenges of Tirana WSSC for the coming years is the modernization of the distribution network, as well as carrying out of new investments in areas where the network is completely lacking, in order to solve once and for all the water supply issue for its residents.<\/p>\n<p>Tirana is a city expanding every day and this brings the need for efficient policies towards the best management of water distribution. \u00a0This is the vision of the company\u2019s leaders, which aims to provide Tirana with a much better quality and 24 hours per day water supply service in the future.<\/p>\n<figure id=\"attachment_2755\" aria-describedby=\"caption-attachment-2755\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"http:\/\/shukalb.al\/wp-content\/uploads\/2019\/07\/UKT-2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-2755\" src=\"http:\/\/shukalb.al\/wp-content\/uploads\/2019\/07\/UKT-2-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" \/><\/a><figcaption id=\"caption-attachment-2755\" class=\"wp-caption-text\"><em>Works for the expansion of Bovilla Water Treatment Plant<\/em><br \/><em>Photo Credit: Tirana WSSC<\/em><\/figcaption><\/figure>\n<p>The total amount to be invested for the rehabilitation of the water supply network of Tirana is 10.5 million Euros.\u00a0 This is an investment initiated as per the same standards of European Union countries, that will improve the water supply capacity for the city of Tirana and the surrounding areas, and at the same time will avoid illegal connections and will prevent water losses in the distribution network.<\/p>\n<p>The Expansion of Bovilla Water Treatment Plant is one of the three investments of this major project implemented by Tirana WSSC. \u00a0Overall, the project has been designed with a 25-year perspective and with a production capacity up to 3,600 liters per second.\u00a0 The Project includes the construction of 10 km long transmission line from Bovilla Lake to the Plant; the expansion of the Plant production capacity by 30%; as well as the construction of a water supply pipeline from the Plant to Yzberisht reservoir.<\/p>\n<figure id=\"attachment_2756\" aria-describedby=\"caption-attachment-2756\" style=\"width: 200px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/shukalb.al\/wp-content\/uploads\/2019\/07\/UKT-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-2756\" src=\"http:\/\/shukalb.al\/wp-content\/uploads\/2019\/07\/UKT-1-200x300.jpg\" alt=\"\" width=\"200\" height=\"300\" \/><\/a><figcaption id=\"caption-attachment-2756\" class=\"wp-caption-text\"><em>Works for construction of Bovilla &#8211; Yzberisht transmission line.<\/em><br \/><em>Photo Credit: Tirana WSSC<\/em><\/figcaption><\/figure>\n<p>This investment will avoid the use of the pumping stations and it will highly impact the company\u2019s efficiency by significantly contributing to savings of electricity, estimated at around 1.1 million euros per year.<\/p>\n<p>Lastly, the construction of the transmission line from Bovilla Plant to Yzberisht reservoir will benefit the inhabitants of Yzberisht, Koder Kamez, Bathore, Institut, Kashar Selite and Liqeni i thate. \u00a0The supply of the above areas directly from Bovilla Plant will ensure the sustainability and the quality of the water supply for all the residents in these newly developed areas.[:]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[:sq] Tre investimet m\u00eb t\u00eb fundit t\u00eb nisura paralelisht nga Uj\u00ebsjell\u00ebs Kanalizime Tiran\u00eb (UK Tiran\u00eb) pritet t\u00eb sjellin nj\u00eb impakt t\u00eb r\u00ebnd\u00ebsish\u00ebm n\u00eb p\u00ebrmir\u00ebsimin e furnizimit me uj\u00eb p\u00ebr Qytetin<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[207,205,213],"tags":[],"class_list":["post-3981","post","type-post","status-publish","format-standard","hentry","category-national","category-news","category-newsletter"],"_links":{"self":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/posts\/3981","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3981"}],"version-history":[{"count":0,"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/posts\/3981\/revisions"}],"wp:attachment":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3981"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3981"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3981"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}