{"id":8846,"date":"2025-03-28T15:42:36","date_gmt":"2025-03-28T14:42:36","guid":{"rendered":"https:\/\/shukalb.al\/?p=8846"},"modified":"2025-03-28T15:49:19","modified_gmt":"2025-03-28T14:49:19","slug":"request-for-expressions-of-interest-trainers-for-for-the-delivery-of-wastewater-program-1b-introduction-to-wastewater-systems-for-managers-and-engineers","status":"publish","type":"post","link":"https:\/\/shukalb.al\/?p=8846&lang=en","title":{"rendered":"Request for Expressions of Interest \u2013 Trainers for the Delivery of Wastewater Program 1B \u201cIntroduction to Wastewater Systems for managers and engineers\u201d"},"content":{"rendered":"<h1><strong>Request for Expressions of Interest \u2013 Trainers for the Delivery of Wastewater Program 1B \u201cIntroduction to Wastewater Systems for managers and engineers\u201d<\/strong><\/h1>\n<p>SHUKALB has received financing for a Project Grant titled \u201cStrengthened Responsive Services to the WSS Sector-Specific Needs in Albania through Capacity Development and Advocacy Activities\u201d commissioned from the German Federal Ministry of Economic Cooperation and Development (BMZ) and administratively embedded in the GIZ Project \u201cOpen Regional Fund for Southeast Europe &#8211; Modernization of Municipal Services (ORF MMS)\u201d.<\/p>\n<p>SHUKALB successfully piloted the Wastewater CD Program during 2021. Yet, such a program is needed for more technical level staff of municipalities and WU in the view of ongoing and up-coming wastewater infrastructure investments projects in Albania. The program\u2019s objective is to improve awareness of Managers and engineers to take an active role during planning and implementation of the wastewater infrastructure. The program will target the Management and technical staff<\/p>\n<p>The objective of this assignment <strong>is to engage co-trainers from the SHUKALB\/RCDN Pool of Trainers (PoT)<\/strong> who will deliver the <strong>Wastewater CD Program 1B \u201cIntroduction to Wastewater Systems for managers and engineers\u201d<\/strong> in Albania, in line with the RCDN Quality Standards (QSs) for Training Delivery.<\/p>\n<p>The targeted audience for the training will be <strong>up to 15 participants<\/strong>, including management and technical staff of PUCs and municipalities who are in the project implementation phase or the design phase of WWTP.<\/p>\n<p>SHUKALB intends to engage a <strong>Lead Trainer <\/strong>for<strong> Module 1: Regulation and Financing <\/strong>and<strong> Module 2: Technology <\/strong>and<strong> two co-trainers, <\/strong>one per each Module.<\/p>\n<p>More details about the required services are found in the <strong><a href=\"https:\/\/shukalb.al\/wp-content\/uploads\/2025\/03\/ToR-for-WW-Program-1B_SHUKALB_Trainers_2025_final.pdf\" target=\"_blank\" rel=\"noopener\">Terms of Reference (ToR)<\/a><\/strong> document.<\/p>\n<p>SHUKALB invites eligible and qualified trainers to indicate their interest in undertaking this assignment. Interested trainers must provide the following documents and information:<\/p>\n<ul>\n<li>Curriculum Vitae,<\/li>\n<li>Reference for relevant assignment, presented in the CV,<\/li>\n<li>Proposed experts&#8217; daily rate. The financial offer shall contain the total budget for executing of the task including travel costs. All amounts should be stated in EUR (gross amount).<\/li>\n<\/ul>\n<p>The proposal must be submitted in the English language by e-mail, at <strong><a href=\"mailto:training@shukalb.al\">training@shukalb.al<\/a><\/strong>, by <strong>04 April 2025<\/strong>.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Water Supply and Sewerage Association of Albania<\/strong><\/p>\n<p>\u201cPjeter Bogdani\u201d str., Build. 13, Ent. 10, Ap. 15, Tirana, Albania<br \/>\n<strong>Attention:<\/strong> <strong>Olta Alla<\/strong>, Program Manager and Training Coordinator<br \/>\n<strong>Telephone:<\/strong>\u00a0(+355\/4) 2245 101<br \/>\n<strong>E-mail<\/strong>: <a href=\"mailto:training@shukalb.al\">training@shukalb.al<\/a><br \/>\n<strong>Website:<\/strong>\u00a0<a href=\"http:\/\/www.shukalb.al\">www.shukalb.al<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Request for Expressions of Interest \u2013 Trainers for the Delivery of Wastewater Program 1B \u201cIntroduction to Wastewater Systems for managers and engineers\u201d SHUKALB has received financing for a Project Grant<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[205],"tags":[],"class_list":["post-8846","post","type-post","status-publish","format-standard","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/posts\/8846","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=8846"}],"version-history":[{"count":0,"href":"https:\/\/shukalb.al\/index.php?rest_route=\/wp\/v2\/posts\/8846\/revisions"}],"wp:attachment":[{"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=8846"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=8846"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shukalb.al\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=8846"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}